Mid
and East Antrim Borough Council
Performance
Self-Assessment Report
2023/2024
For further information, or to request a copy of this report
in an alternative format, contact:
Corporate Performance and
Improvement Team
Mid and East Antrim Borough
Council
1-29 Bridge Street
Ballymena
BT43 5EJ
Email address: performance@midandeastantrim.gov.uk
Contents:
·
Welcome
·
Duty to Improve
·
Arrangements to Secure Continuous Improvement
·
Performance Indicators and Standards:
-
Improvement Objectives
-
Statutory Key Performance Indicators
-
Self-Imposed Performance Indicators
·
Benchmarking
·
Looking Forward
·
Assessment of Performance
·
Get Involved
·
Closing Remarks
·
Appendices:
-
Appendix 1: Audit
-
Appendix 2: Internal Benchmarking
-
Appendix 3: External Benchmarking
-
Appendix 4: Benchmarking and Best Practice Case
Studies
Welcome
As the Interim Chief Executive
of Mid and East Antrim Borough Council, I would like to welcome you to our
Performance Self-Assessment Report for 2023/24.
As a Council, and as a
community, we have faced considerable challenges over the last number of years.
As an organisation, this has presented us with an opportunity to take a closer look
at our operations, and to determine what we can do better, more efficiently,
and more cost-effectively, and we have designed and implemented significant
change to achieve this.
We recently launched our new four-year
Corporate Plan, which alongside our annual Performance Improvement Plans, will
help to improve the quality of life for everyone who lives, works, does
business in, or visits our borough.
It is crucial that we have
adequate arrangements to measure our performance in achieving our goals and in
evaluating the impact of our actions.
This report does just that. It
looks at our performance in discharging our duty to make
arrangements to secure continuous improvement, and in meeting our
Improvement Objectives, statutory standards, and other key performance
indicators. The report also identifies areas where improvements can be made,
and the steps we will take to do so.
As the transformation of Mid
and East Antrim Borough Council continues, we are working hard to further align
our operations with the challenges we face.
We are always looking for new
ways to adapt and thrive, and we are committed to engaging with our communities
to make sure that we not only understand local needs, but that we make the best
use of our resources to meet them.
With the recent introduction
of public questions at meetings of the Full Council, we have demonstrated our
commitment to championing openness and transparency. Ideas for improvement can
also be submitted at any time throughout the year by contacting the Performance
and Improvement Team at: performance@midandeastantrim.gov.uk
While this report looks back
on our past performance, I also look forward to the year ahead, as we continue
to bring our ambitions and vision to life.
Valerie
Watts
Interim
Chief Executive
Duty to Improve
Under
the Local Government Act (Northern Ireland) 2014, councils have a general duty
to make arrangements to secure continuous improvement
in the exercise of their functions.
For
each financial year, a council must set itself Improvement Objectives, and have
arrangements in place to secure their achievement.
The
objectives must be framed to bring about improvement in at least one of the
following areas: strategic effectiveness, service quality, service
availability, fairness, sustainability, efficiency, and innovation.
Councils
must make arrangements for the publication of an
assessment of its performance during a financial year:
·
In
discharging its duty to make arrangements to secure
continuous improvement,
·
In
meeting its Improvement Objectives applicable to that year; and,
·
In
meeting the statutory performance indicators and self-imposed indicators
applicable to that year.
The
publication must also include an assessment of the Council’s performance in
exercising its functions during a financial year as compared with:
·
Its performance in previous financial years,
and
·
So far as is reasonably practicable, the
performance during that and previous financial years, of other councils.
The Performance
Self-Assessment Report must be published by 30 September each year.
You can view our Performance
Self-Assessment Reports on our website at: www.midandeastantrim.gov.uk/performance
What
is improvement
For us,
improvement is not limited to gains in service output or efficiencies. It is
about focusing on the issues that are important to our citizens and businesses,
helping us to achieve our vision of improving the quality of life for all.
Arrangements to Secure Continuous
Improvement
Our arrangements to secure continuous improvement are
outlined within our Performance Management Framework.
This framework drives performance at all levels within
the organisation, and illustrates how our corporate strategies, aims and
objectives, flow through the organisation to link to each employee’s individual
work plan.
We
use a series of measures to monitor our performance and to identify any improvements
that we make.
These
arrangements are supported by a dedicated performance management system.
Our Performance Management Framework |
|
The
Community Plan
(2017-2032) |
·
The Community Plan sits at the top of
the framework and sets the 15-year vision for the borough. It is led by the
Council and was developed in partnership with a range of stakeholders from
the borough's public, private and voluntary sectors. |
The
Corporate Plan
(2024-2028) |
·
Our 4-year strategic plan shapes our
services and drives our annual business planning process, ensuring everything
we do is aimed at achieving our objectives and our vision. |
The
Performance Improvement Plan |
·
This annual improvement plan sets out
our key Improvement Objectives for the year ahead, and helps to meet the aims
of the Community Plan and the Corporate Plan. |
Annual Business
Plans |
·
Each service area develops an annual
business plan, with objectives and key performance indicators which link
directly to the Community Plan, Corporate Plan and Performance Improvement
Plan. |
Employee
Personal Development Plans |
·
These plans are completed by employees
annually, and link work, and learning and development needs, to departmental
objectives, the Corporate Plan, and ultimately, to the Community Plan. |
Identifying Areas for Improvement
Our Performance Management Framework ensures a clear
link between the Community Plan and our arrangements to secure continuous
improvement. This helps to ensure better long-term outcomes for citizens.
Our
priorities for improvement are based on a thorough, evidence-based
understanding of the communities we serve, local needs, and an assessment of
our capacity to meet those needs.
Our
development approach includes:
·
A
review of legislation and statutory guidance.
·
Self-analysis
through Performance Self-Assessments and audit results.
·
Alignment
with the Programme for Government, Community Plan, Corporate Plan, and other
internal strategies and policies.
·
An
analysis of our environment and regional statistics.
·
The
results of our Citizens Survey (2022) and public consultations.
·
Staff
input and direction.
·
Equality,
Rural, Climate and Sustainability, and Data Protection Impact Assessment screenings.
Feedback
We are committed to
continuously improving our services and welcome comments or suggestions for
improvement at any time throughout the year. If you have an idea for
improvement, please get in touch by emailing: performance@midandeastantrim.gov.uk
Members of the public who
live, work or study in the borough can also put their questions directly to
Elected Members and officers at Mid and East Antrim Borough Council by
completing a short form on our website, at: www.midandeastantrim.gov.uk/publicquestions
You Told Us
Our Citizens Survey (2022)
consisted of a representative sample of 810 people from across the borough. The
results provided a comprehensive understanding of the views of our communities,
including, satisfaction ratings, levels of health and wellbeing, perspectives
on the area as a place to live in, and priorities for the area.
Citizens’ top priorities for
making the borough a better place to live in were:
1. Supporting and developing activities for children and young
people.
2. Support to reduce poverty.
3. Developing skills and job prospects.
4. Delivering clean and attractive streets and towns.
5. Supporting our parks, green spaces and the natural and built
environment.
Monitoring, Reporting and
Governance
Oversight
of our performance improvement responsibilities sits within the remit of the Corporate
Resources, Policy and Governance Committee.
Our reporting structures have been designed to
ensure proper oversight and accountability across all Council activities. They
provide our Senior Management Team and Elected Members with assurances that our
governance arrangements are robust. This helps to ensure transparency, accountability
and to further drive continuous improvement.
With
regard to performance, the role of the Committee is to:
·
Review corporate performance, and make
recommendations for course correction when performance is not meeting targets.
·
Consider opportunities for innovation and best
practice to ensure continuous improvement and quality service delivery.
Our annual reporting arrangements are as follows:
·
The Community Plan is reported to:
- The
Strategic Alliance (every six months).
- The
Community Panel (every quarter).
- The Neighbourhoods
and Communities Committee (as appropriate).
·
The Corporate Plan is reported to:
- The
Senior Management Team (every six months).
- Full
Council (every six months).
·
The Performance Improvement Plan is reported to:
- The
Senior Management Team (every quarter).
- The
Corporate Resources, Policy, and Governance Committee (every quarter).
·
Annual Business Plans are reported to:
- The
assigned Director (every quarter).
·
The Performance Self-Assessment Report is reported
to:
- Senior
Management Team (each year).
- Full
Council (each year).
Performance Audits and Assessments
Our arrangements to secure continuous improvement
are subject to an annual audit and assessment by the Northern Ireland Audit
Office, in accordance with section 93 of the Local Government Act (Northern
Ireland) 2014 and the Code of Audit Practice for local government bodies. The
results of the 2022/23 audit are summarised below.
Improvement planning and publication of improvement
information
The Local Government Auditor believes the Council
has discharged its duties in connection with (1) improvement planning and (2)
publication of improvement information in accordance with section 92 of the Act
and has acted in accordance with the Department for Communities’ guidance
sufficiently.
Improvement assessment
As a result of the assessment, the Local Government
Auditor believes the Council has discharged its duties under Part 12 of the Act
and has acted in accordance with the Department for Communities’ guidance
sufficiently. In their opinion, the Council has demonstrated a track record of
ongoing improvement, and they believe that the Council is likely to comply with
Part 12 of the Act during 2023/24. They did not conduct an assessment to
determine whether the Council is likely to comply with the requirements of Part
12 of the Act in subsequent years. The need for this will be kept under review.
Other matters
The auditor did not have any recommendations to
make under section 95(2) of the Act. They are not minded to
carry out a special inspection under section 95(2) of the Act.
All
prior proposals for improvement have been implemented, with the exception of two,
for which an update is provided in Appendix 1.
Performance
Indicators and Standards
Each year, the Council collects
information which allows us to assess our performance in meeting our Improvement
Objectives, statutory performance indicators and standards, and our self-imposed
indicators and standards.
We also compare our
performance with previous financial years, and where practicable, with the
financial years of other councils.
Improvement Objectives
We develop our Improvement
Objectives each year based on an evidence-based understanding of local needs
and our capacity to meet those needs. Our objectives align with the Council’s
longer-term vision for improvement, and care is taken to ensure that each objective
is:
·
Legitimate – It makes a demonstrable
contribution to one or more aspects of Improvement defined in the Local
Government Act (NI) 2014.
·
Clear – It sets out the visible improvements
citizens can expect.
·
Robust – It has defined terms of success.
·
Deliverable – It has established links to
individual service programmes and budgets.
·
Demonstrable – It is capable of being supported
by objective evidence.
We publish our Improvement
Objectives within our annual Performance Improvement Plan.
Statutory Performance
Indicators and Standards
The Department for Communities
set statutory indicators and standards for councils in the functional areas of Planning,
Economic Development, and Waste Management. These indicators are incorporated into
our Improvement Objectives, where possible.
We report our results every
three months to the relevant government bodies, and summarise them within our
Performance Improvement Plan update reports, which are published on our
website.
Self-Imposed Performance
Indicators and Standards
Our self-imposed performance indicators
and standards are set out within our Corporate Plan, and reinforced through our
annual business planning process. Our Corporate Plan aligns with the Community
Plan for the borough, ensuring the longer-term vision for the area is
supported.
Our performance against each
of these three types of indicators is analysed in detail in the pages that
follow.
Improvement Objectives
Continuous improvement
remained at the forefront of our agenda in the 2023/24 financial year. As an
organisation and as a community, the year brought many challenges, including a
cost-of-living crisis, surging inflation, and tightened financial conditions. These
challenges hit particularly hard, as we continued on our recovery from the
pandemic.
Based on extensive stakeholder
engagement, we developed our Performance Improvement Plan for the year. The
plan focused on enhancing our citizens’ health and wellbeing, particularly for
those who were vulnerable. It sought to improve employment outcomes, and to
provide support to help our businesses start-up and grow. The plan also focused
on regenerating our town centres, and attracting visitors into them.
It aimed to enhance service
provision within our community centres through the provision of full-fibre
broadband, and to support the development of the electric vehicle charging
network.
The Plan was agreed by the Full
Council on 12 June 2023.
Our Improvement Objectives for
2023/24:
Objective 1: Growing the
economy and creating jobs
Identify ways to increase
local jobs and employment opportunities within Mid and East Antrim.
Objective 2: Revitalising our
towns
Through a variety of
regeneration activities, support our businesses, welcome inward investment, and
attract visitors to our towns.
Objective 3: Supporting our
citizens' health and wellbeing
Encourage and promote regular,
safe, and responsible use of our parks and open spaces by providing quality,
sustainable and inclusive opportunities.
Objective 4: Working in
partnership to support our citizens, particularly those who are vulnerable
Through citizen-focused
projects, including Autism-Friendly and Age-Friendly initiatives.
Objective 5: Improving
infrastructure to support the transition to low-carbon transport systems
To reduce emissions and
protect the environment for future generations.
Objective 6: Enhancing
customer engagement and service delivery
Develop the Council's use of
information technology to improve customer engagement and service delivery.
Annual
Performance Summary
We use a series of outcomes
and measures to assess whether or not we achieve our Improvement Objectives. The
outcomes are what citizens can expect to see from the delivery of our Improvement
Objectives. The measures are the indicators we use to track progress.
At the end of the year,
of our 33 measures:
·
61% were achieved or on track.
·
36% were delayed but progressing, and
·
3% were not achieved.
Greater
detail on each of the objectives is provided in the pages that follow.
Any
ongoing measures (or indicators) from the Performance Improvement Plan for 2023/24
continue within the Performance Improvement Plan for 2024/25, unless stated
otherwise.
Improvement
Objective 1: Growing the Economy and Creating Jobs
Through
identifying ways to increase local jobs and employment opportunities within Mid
and East Antrim.
Why
are we doing this?
·
4,680 redundancies were confirmed in Mid and
East Antrim since 2013. (Source: Northern Ireland Statistics and Research
Agency, Labour Market Report Redundancy Tables, October 2022).
·
Developing skills and job prospects ranked the
third top priority for making the borough a better place to live in. (Source:
Mid and East Antrim Borough Council Citizens Survey, 2022).
·
Only 28% of citizens agreed that Mid and East
Antrim is a good area for job opportunities. (Source: Mid and East Antrim
Borough Council Citizens Survey, 2022).
Who is
responsible?
·
The Director of Development
Outcome 1 |
Programmes to encourage skills
development and employability. |
Measure
1 |
The
delivery of 8 employment and skills programmes by 31 March 2024. |
Status:
Achieved |
We delivered
a total of 20 employment and skills programmes. These included: 1. Forklift 2. Classroom
Assistant 3. Transport 4. Restaurant 5. Manufacturing 6. Childminding 7. Enterprise
Pathways 8. Paediatric
First Aid 9. Work
Connections 10. Health
Support Services 11. Female
Manufacturing 12. Do
it Herself (Ballymena area cohort) 13. Administration
Academy 14. Graduate
Disability Programme 15. Do
It Herself (Larne area cohort) 16. Plant
Operations 17. Security
Industry Association 18. Education
and Training (level 3). 19. Engineering
Academy 20. Tourism |
Outcome 2 |
The promotion of new jobs in the
borough through business start interventions. |
Measure
1 |
The
promotion of 85 jobs by 31 March 2024. |
Status:
Achieved |
Between
April 2023 and March 2024, there were 103 jobs promoted through business
start interventions, 66 through the Go for It programme and 37 through Go
Succeed (including Enterprise Pathways participants into employment). Go
Succeed is the new Northern Ireland Entrepreneurship Support Service, which
launched in November 2023. |
Measure
2 |
The
implementation of the Northern Ireland Entrepreneurship Support Service
(NIESS) by 31 March 2024, in partnership with all Northern Ireland councils. |
Status:
Achieved
|
Go
Succeed is progressing well, with strong local interest. Almost 300 Mid and
East Antrim based individuals have signed up for support across the Start-Up
and Growth elements of the service. |
Outcome 3 |
An effective and efficient Planning
Service to maximise economic development. |
Measure
1 |
To
adopt the Local Development Plan Strategy by 31 December 2023. |
Status: Achieved |
The
Local Development Plan Strategy was adopted by the Council on 16 October
2023. The aim is to create a borough that supports sustainable economic
growth and innovation, infrastructure, the right mix of housing, and to
improve the wellbeing of our communities. |
Measure
2 |
A
processing time for major planning applications within an average of 30 weeks
by 31 March 2024. |
Status:
Not
achieved |
From
April 2023 to March 2024, the average time for the processing of major
planning applications was 67.4 weeks, up from 47.6 weeks in 2022/23. This increase was primarily due to the
prolonged review of an unusually complex application. The
average processing time across all Northern Ireland councils was 46.5 weeks.
Only 3 councils met the 30-week target, with Mid and East Antrim ranking
ninth position. |
Measure
3 |
A
processing time for local planning applications within an average of 15 weeks
by 31 March 2024. |
Status: Achieved
|
From
April 2023 to March 2024, the average time for the processing of local
planning applications was 9.4 weeks, up from 8.6 weeks in 2022/23. The
average processing time across all Northern Ireland councils was 20.8 weeks.
Only 3 councils met the 15-week target, with Mid and East Antrim Borough
Council achieving the shortest average processing time in 2023/24. |
Measure
4 |
70%
of enforcement cases concluded within 39 weeks of receipt of complaint by 31
March 2024. |
Status: Achieved |
From
April 2023 to March 2024, 87.3% of enforcement cases were concluded within 39
weeks, down from 89.5% in 2022/23. The
average across all Northern Ireland councils was 76.4% in 2023/24, up from
74.2% in 2022/23, with 7 councils meeting the target last year. Mid and East
Antrim Borough Council ranked third position. |
Employment and Skills programme case
studies
Do it Herself
This bespoke academy aimed to encourage
greater participation of females in the labour market through training in
non-traditional skills, such as tiling, joinery, decorating, and confidence
building. Of 10 participants, 6 gained a level 2 qualification, and lots of
positive feedback was received:
“All
aspects of the course were ideal. I could not fault anything. From beginning to
end, the depth of knowledge to the atmosphere, to the tools and materials
provided were exceptional and professional.”
“I
like my own independence to complete jobs within the home and this has
empowered me to, not only by learning new skills but to have the confidence and
know-how.”
Graduate
Disability Academy
This
programme provides training and employment opportunities and outcomes, for graduates
with disabilities who are unemployed, underemployed, or economically inactive.
A total of 8 placements were completed, 3 qualifications were secured, and 2
participants gained employment.
Transport
Academy
A
total of 20 participants were recruited onto this academy, an intensive
training intervention which develops practical industry knowledge and skills
for people who are unemployed, underemployed, at risk of redundancy, or who
want to skill up. Licenses were acquired by 8 participants, and 5 have secured
employment.
Improvement Objective 2:
Revitalising our towns
Through a variety of
regeneration activities, support our businesses, welcome inward investment, and
attract visitors to our towns.
Why are we doing this?
·
Delivering clean and attractive streets and
towns was identified as being one of the top 5 priorities for making Mid and
East Antrim a better place to live in. (Source: Mid and East Antrim Borough
Council Citizens Survey, 2022).
·
Of 20 potential actions, respondents ranked
clean and attractive towns and streets as the joint second most popular action
the Council could take to make their area a better place to live in. The
regeneration of towns and streets ranked seventh.
(Source: Mid and East Antrim Borough Council
Citizens Survey, 2022).
Who is responsible?
·
The Director of Development and the Director of
Operations.
What you’ll see
Outcome 1 |
Clean and attractive towns and streets. |
Measure
1 |
A
Keep Northern Ireland Beautiful Street Cleansing Index score of 66% or above
by 31 March 2024. |
Status:
Achieved |
Surveys
were undertaken in July to September 2023, and January to March 2024, with a
score of 70% achieved within each period. |
Outcome 2 |
Enhancement of Ballymena and Larne town
centres through public realm improvement works. |
Measure
1 |
The
completion of public realm improvement works at Point Street Larne by 31
August 2023. |
Status:
Achieved |
The
public realm works completed on 5 May 2023, and included additional
infrastructure upgrades by Northern Ireland Electricity. The cleaning and
sealing of the footway took place shortly after, alongside the
decommissioning of the works compound. |
Measure
2 |
The
completion of public realm improvement works at Castle Street Ballymena by 31
December 2023. |
Status:
Achieved |
The
public realm works, comprising the public footway on Bridge Street and Castle
Street, and road resurfacing, completed in January 2024. |
Outcome 3 |
Revitalisation Scheme delivered within
our 3 main towns. |
Measure
1 |
To
agree the Revitalisation Scheme by 30 September 2023. |
Status:
Delayed
but progressing |
The
first application for funding was successful, with a Letter of Offer received
from the Department for Communities for over £400,000. A second application,
for street art across the borough’s three main towns, was also successful,
with a Letter of Offer received for £54,000. An
additional funding application will be submitted within the 2024/25 financial
year. This action is included in the Performance Improvement Plan for 2024/25. |
Measure
2 |
To deliver
the Revitalisation Scheme by 31 March 2025. |
On track |
The programme is progressing well, and
continues within the Performance Improvement Plan for 2024/25. The Shopfront Improvement Scheme was
very successful, with a reallocation of budget agreed to meet demand. 89
businesses availed of the funding, which totalled approximately £305,000. Ballymena and Carrickfergus sound systems
have been purchased and are due for installation by 30 September 2024.
Pavement café furniture was purchased and distributed, with 13 businesses
benefiting throughout the borough. Planting took place within Ballymena,
Carrickfergus, and Larne. A series of animation activities also
took place throughout the year, including Larne Fashion Show, a mini-food
festival in Ballymena, and an interactive programme called ‘A living map’ in
Carrickfergus. The smart benches are being funded through an alternative
funding source. |
Outcome 4 |
Up to 10 buildings of historical and
architectural interest restored in Carrickfergus through the Townscape
Heritage Initiative, with Council and Heritage Lottery grant assistance. |
Measure
1 |
The
restoration of 10 buildings of historical and architectural interest by 30
September 2023. |
Status: Delayed
but progressing |
The
tenth, and final property has experienced considerable delays in the drying
of the internal plaster, due to damp weather conditions. The project has
received an extension until 31 October 2024. This action continues within the
Performance Improvement Plan for 2024/25. |
Outcome 5 |
The local community will have a better
understanding of built heritage. |
Measure
1 |
To
deliver a Built Heritage Education programme by 30 September 2023. |
Status:
Delayed but progressing |
A
post project evaluation, closing event and publication on the scheme will be issued
on completion of the final property. This action continues within the
Performance Improvement Plan for 2024/25. |
Outcome 6 |
Increased inward investment and local
employment opportunities related directly and indirectly to heritage and
tourism growth. |
Measure
1 |
Increased
floor space for retail, commercial or residential use by 30 September 2023. |
Status:
Delayed
but progressing |
This
will be determined on completion of the final property. This action continues
within the Performance Improvement Plan for 2024/25. |
Improvement Objective 3:
Supporting our Citizens’ Health and Wellbeing
To encourage and promote
regular, safe, and responsible use of our parks and open spaces by providing
quality, sustainable and inclusive opportunities.
Why are we doing this?
·
Citizens ranked support and activities for
children and young people as the most important thing that needed to be
improved to make the area a better place to live in. (Source: Mid and East
Antrim Borough Council Citizens Survey, 2022).
·
Almost half would like to see more support
services for children and families and/or those with disabilities, and more
than a third would like to see more access to green spaces such as parks and
forests. (Source: Mid and East Antrim Borough Council Citizens Survey, 2022).
·
Both the Play Strategy and Play Investment
Framework for Mid and East Antrim emphasise the need for play.
·
Our landscape provides excellent opportunities
to enhance health and wellbeing, as outlined in our Outdoor Recreation
Strategy.
Who is responsible?
·
The Director of Community and the Director of
Operations
What you’ll see
Outcome 1 |
5 replacement play parks completed by
30 June 2023. |
Measure
1 |
To
replace play parks at: 1. Ballymena
Road (Ahoghill) 2. Martinstown
3. Ferris
Park (Larne) 4. Woodburn
(Carrickfergus) 5. Wilson
Crescent (Ballymena) |
Status:
Achieved |
All 5
play parks are complete and open to the public. |
Outcome 2 |
2 replacement play parks completed by
31 March 2024. |
Measure
1 |
To
replace play parks at: 1. Clough 2. Marine
Gardens (Carrickfergus) |
Status:
Delayed but progressing |
While both playparks did not complete by the original
deadline, they continued within the Performance Improvement Plan for 2024/25,
with Clough completing in April 2024, and Marine Gardens completing in June
2024. |
Outcome 3 |
3 new or upgraded multi-use games area or
kick-about areas completed by 30 June 2024. |
Measure
1 |
New
or upgraded multi-use games or kick-about areas in: 1. Portglenone 2. Carnlough 3. Glynn |
Status:
Achieved |
Both Carnlough and Portglenone sites completed and
reopened to the public in June 2024, Glynn completed and reopened in July
2024. These
actions form part of the Performance Improvement Plan for 2024/25. |
Outcome 4 |
1 new skatepark completed by 31 March
2024. |
Measure
1 |
A
new skate park in Larne by 31 March 2024. |
Status:
Delayed but progressing |
Work is underway and is expected to complete by
September 2024. This action forms part of the Performance
Improvement Plan for 2024/25 for delivery by 31 October 2024. |
Outcome 5 |
5 outdoor safety training courses
delivered. |
Measure
1 |
Deliver
4 courses by 31 March 2023, and another by 31 December 2023. |
Outcome:
Achieved |
All 5
courses are complete, with a total of 152 attendees. |
Outcome 6 |
Outdoor events delivered by 31 March
2024. |
Measure
1 |
Deliver
20 events, with 50 participants. |
Status:
Achieved |
A
total of 79 events were held, which were attended by 2,712 people. Of these,
17 were held in the final months of the year, and included activities such as
Wild about Food events, the Big Garden Bird Watch, Willow and Hazel
coppicing, creating hurdles and garden obelisks, Natural Play Sessions,
Easter at Carnfunnock, and more. |
Outcome 7 |
Number of trees planted by 31 March
2024. |
Measure
1 |
Plant
5,000 trees by 31 March 2024. |
Status:
Achieved |
The
total number of trees planted in 2023/24 was 60,512. Approximately 58,500
were planted on non-Council land, and 2,000 on Council’s land. |
Improvement Objective 4:
Working in partnership to support our citizens, particularly those who are
vulnerable
Through citizen-focused
projects, including Autism-Friendly and Age-Friendly initiatives.
Why are we doing this?
·
Almost half of citizens said they would like to
see more support services for children and families and/or those with disabilities.
Less than half agreed the borough is a good area for supporting equality and
inclusion. (Source: Mid and East Antrim Borough Council Citizens Survey, 2022).
·
Figures extracted from the 2022 to 2023
Northern Ireland School Census show that 15,212 school aged children had been
diagnosed with autism, representing an estimated autism prevalence rate of 5%
within the school aged population. (Source: ‘Prevalence of Autism (including
Asperger Syndrome) in School Age Children in Northern Ireland’ Department of
Health and NISRA (2023).
·
Of 20 actions we could take to make your area a
better place to live in, citizens ranked affordable quality housing joint
second. 57% agreed the borough is a good area for a sense of belonging among
people. (Source: Mid and East Antrim Borough Council Citizens Survey, 2022).
Who is responsible?
·
The Director of Community
What you’ll see
Outcome 1 |
The promotion and delivery of the
Autism-Friendly Initiative. |
Deliver 10 Autism-Friendly workshops to service
providers by 31 March 2024. |
|
Status: Achieved |
A total of 157 people participated in 14
Autism Awareness workshops this year. We held 10 sessions with the Police
Service of Northern Ireland, 1 with the Braid Museum and Arts Centre, 2 with
Libraries NI, and 1 with the Girls Brigade in Carrickfergus. |
Measure
2 |
Deliver
3 Autism-Friendly Roadshows within Ballymena, Carrickfergus, and Larne by 31
March 2024. |
Status:
Achieved |
The
final roadshows have taken place. Life
after ASD diagnosis Healthy Living and Healthy Minds was held in Larne in
February 2024, with 35 participants. Speakers included the National Autistic
Society NI, the Northern Health and Social Care Trust’s Take 5 and Autism
teams, the Northern Regional College on healthy eating, Autism NI, and
Council departments. The event included a Makaton demonstration. Employability,
Benefits, and Independent Living took place in Ballymena in March 2024, with
10 participants. Speakers included the NOW Group, Access Employment Limited,
Ulster Supported Employment Limited, Triangle, the Department for
Communities, the Northern Health and Social Care Trust, the Public Health
Authority’s Autism team, and Make the Call. |
Measure
3 |
Develop
a Communications Plan to raise awareness of the initiative by 31 March 2024. |
Status:
Delayed but progressing |
A series
of activities were undertaken throughout the year, including an article on
our intranet to mark World Autism Awareness Week, and the promotion of the Autism-Friendly
roadshows. 310 staff members have also completed JAM (Just A Minute) Card
Training, and we continue to promote further uptake. We
are also working with the Equality Commission NI and the Department of Health’s
Autism Strategy Team to review the ‘Every Customer Counts Business Checklist’
to ensure it accommodates the needs of autistic people, and will promote the
resource when it launches. This
action continues within the Performance Improvement Plan for 2024/25. |
Measure
4 |
Deliver
4 Autism-Friendly Action Plans in Council venues by 30 September 2023. |
Status:
Delayed but progressing |
Delivery
of the action plans at the Braid Museum and Arts Centre, Larne Arts Centre,
Carrickfergus Museum, and Andrew Jackson Cottage is still underway. This
action continues within the Performance Improvement Plan for 2024/25 for
implementation by 30 September 2024. |
Measure
5 |
4
additional Autism Champions within Council by 30 September 2023. |
Status:
Delayed but progressing |
Of
the 5 people identified for completing Autism NI’s Autism Champion
qualification, 1 person completed it by 31 March 2024, with the remaining 4 to
do so before 30 September 2024. This action continues within the Performance
Improvement Plan for 2024/25. |
Measure
6 |
An
Autism Awareness Train the Trainer programme developed and shared with
partner organisations by 31 March 2024. |
Status:
Achieved |
A
pilot programme was rolled out with Libraries NI in June 2023. The
development of a bespoke Train the Trainer programme continues with the
Police Service of Northern Ireland’s Tactical Support Group unit and the
Police Training College. Work
continues with Community Planning partners to further refine the generic
training materials for in-house use. |
The establishment of an Age-Friendly Alliance. |
|
Measure 1 |
To develop a Mid and East Antrim Age-Friendly
Alliance by 31 December 2023. |
Status: Achieved |
The first meeting of the Age-Friendly
Alliance took place in November 2023, and a second on 23 January 2024. |
Measure 2 |
To develop a Mid and East Antrim
Age-Friendly Action Plan by 31 March 2024. |
Status: Delayed but progressing |
A public consultation on the draft plan took
place from 5 April to 31 May 2024. A workshop was held in June to analyse
feedback, with subsequent amendments made following a meeting in July. The
launch of the plan is now scheduled for October 2024, to coincide with
Positive Ageing Month. This action continues within the Performance
Improvement Plan for 2024/25. |
Outcome 3 |
The development of a borough-wide
Landlord Forum. |
To develop a borough-wide Landlord Forum
by 31 March 2024. |
|
Status: Achieved |
Arrangements for the Mid and East Antrim
Landlord Forum to act as a subgroup of the Landlord Association (Northern
Ireland) are now in place. However, it has not been possible for the Forum to
hold its first meeting as planned this quarter, and as the newsletter intends
to promote the meeting, it has also been subject to delay. New dates are
being arranged. The Council will step back from its
leadership role but will continue to provide appropriate support to the
Forum, and will review this within 12 months. We will also continue to engage with
community-led initiatives with the aim of achieving sustainable environmental
improvements. |
Improvement Objective 5:
Improving Infrastructure to support the transition to low-carbon transport
systems
To reduce emissions and
protect the environment for future generations.
Why are we doing this?
·
The phase out date for the sale of new petrol
and diesel cars and vans is 2035.
·
In a FASTER Project survey in 2021, which
established attitudes and behaviour towards transport use, almost 30% of
Northern Ireland’s respondents (totalling 464) were from Mid and East Antrim
(totalling 134 people). Of these, 34% of those who plan to change their vehicle
in the next 3 years said they would be likely to purchase a battery electric
vehicle.
·
When asked what the Council should prioritise
to be more environmentally friendly, awareness and assistance in tackling
climate change was the second most popular response. (Source: Mid and East
Antrim Borough Council Citizens Survey, 2022).
Who is responsible?
·
The Director of Operations
What you’ll see
Outcome 1 |
Fast electric vehicle chargers
installed across the borough, through the On-street Residential Chargepoint
Scheme. (It is now anticipated that the
capacity of the chargers will be 22kw, with a charge in 4 to 6 hours). |
Measure
1 |
12
fast chargers installed at agreed locations by 31 March 2024. |
Status:
Delayed but progressing |
This
joint Northern Ireland council project has experienced considerable delay
securing agreement on the tender documentation, with procurement now expected
to complete by 30 September 2024. The installation date will be confirmed
thereafter. This
action continues within the Performance Improvement Plan for 2024/25. |
Improvement Objective 6:
Enhancing Customer Engagement and Service Delivery
To develop the Council’s use
of information technology to improve customer engagement and service delivery.
Why are we doing this?
·
To be a High Performing and Sustainable Council
is a strategic priority within our Corporate Plan.
·
Digital transformation initiatives can improve
our management reporting and help inform our decision-making. It can provide us
with greater flexibility in how we deliver our services, leading to gains in
efficiencies and better value for money for our ratepayers.
Who is responsible?
·
The Interim Director of Corporate Services
What you’ll see
The digital transformation of at least one customer-facing
service. |
|
Measure 1 |
16 Council-managed community
centres connected to full-fibre broadband by 30 September 2023. |
Status: Delayed but progressing |
Following a review of our Community
Development service, the number of Council-managed community centres reduced
to 10. Each of these facilities has been upgraded with cabling to enable
full-fibre broadband. Due to wider digital transformation
activities within the organisation only 4 of our centres are currently fully
connected. The remaining 6 will be connected in the 2024/25 financial year,
alongside 4 additional centres, which are now back within the Council’s
direct management. This action continues within the
Performance Improvement Plan for 2024/25 for delivery by 31 March 2025. |
Previous Year’s Improvement
Objectives
While most of our previous
objectives are complete, some were not achieved in the year in which they
related. An update is provided below.
Objective 1: Encourage people
to value our natural environment through the promotion of the Green Dog Walkers
Scheme.
Outcome 1 |
A cleaner borough. |
Measure
1 |
A
reduction in the number of residents perceiving dog foul to be an issue in
our local areas. |
Status:
Not
achieved |
The 2022 survey was conducted in a post-pandemic environment,
which may have affected results. During this time, there was a substantial
increase in local outdoor activity as people stayed close to home and worked
from home. Anecdotal evidence also
suggests that pet ownership increased during this time, with a significant
proportion of individuals obtaining a dog having never owned one before.
Access to dog training services and peer support was also reduced throughout
the pandemic. We continue to encourage responsible pet ownership, and seek to
influence behavioural change through the Green Dog Walkers Scheme, which is
integrated into everyday practices and is at the core of our communications. While updates will no longer be reported through the Performance
Improvement Plan, dog foul complaints
will be monitored and reported to the relevant committee every six months. |
Objective 2: Improving
customer engagement and service delivery by enhancing the Council’s use of
information technology.
Outcome 1 |
The continued implementation of the
Council’s Agile Framework, through the delivery of a number of
citizen-focused projects. |
Measure
1 Measure
2 |
The
redesign of the Council’s website developed from user experience feedback
(phase 3). The
expansion of the automated customer call system into an additional service
area. |
Status:
Stopped |
The
Council is in the process of designing and implementing significant change to
operate more effectively and efficiently. One element of this
transformational work includes a technology review across the organisation.
The website redesign and expansion of the automated customer call system are
not being progressed at present and will form part of the wider review. |
Objective 3: The development
of Sullatober Household Recycling Centre
Outcome 1 |
A larger site with improved
infrastructure and accessibility to maximise re-use and recycling. |
Measure
1 |
A 6,500m2
site by 31 March 2022. |
Status:
Achieved |
The new and improved household recycling centre
opened in May 2022. The more user-friendly site enables more efficient waste
disposal, quicker traffic throughput and less congestion. The area has since
benefited from additional investment, including the upgrading of surrounding
roads and the development of new business units. |
Measure
2 |
Increase
the recycling rate by 23.2% by 31 March 2023. |
Status:
Not
achieved |
The
recycling rate for April to December 2023 was 65.8%, an increase of 2.5% (1.6
percentage points) from the 2018 baseline year (64.2%). While we continue to
encourage recycling through the provision of modern facilities and
environmental education programmes, recycling remains at the public’s
discretion. As a result, it is not anticipated the original 23.2% target can
be achieved. This measure will no longer be reported through the Performance
Improvement Plan. The
level of domestic and commercial waste, recycling, street cleanliness and fly
tipping etc., will be reported to the Council’s Environment and Economy
Committee each quarter, and the statutory waste indicators, will continue to
be reported within the Performance Improvement Plan for 2024/25. |
Measure
3 |
1,046
additional tonnes of recycled materials by 31 March 2023. |
Status:
Not
achieved |
There
were 235.6 additional tonnes of recycled materials from April to December
2023 (+8.4%) compared with the same period in 2018 (baseline year). Although
improvements continue to be made to our recycling operations, after due
consideration, it is not anticipated that the original target can be
achieved. This
measure will no longer be reported through the Performance Improvement Plan. |
Measure
4 |
12
additional tonnes of re-used materials by 31 March 2023. |
Status:
Achieved |
There
were 30.53 additional tonnes of re-used materials from April to December 2023
compared with the same period in 2018 (baseline year). Examples
of types of re-used materials include additional waste electronic and electrical
equipment, furniture and bric-a-brac, and textiles and footwear. Improvements
continue to be made to the segregation and management of materials for
re-use. |
|
|
Outcome 2 |
Financial savings by compacting waste
and reduction in fuel consumption. |
Measure
1 Measure
2 |
50%
reduction in containers hauled per newly compacted material by 31 March 2023. Reduce
tCO2e by 800 by 31 March 2023. |
Status:
Stopped |
A
significant number of shifting variables make it impossible to provide a
reliable comparison between the 2018/19 baseline year, and the 2023/24
financial year, as follows: ·
Waste collection, management and methods
of disposal differ due to legislative changes, and contrasting practices at
the disposal sites used by the Council. ·
The Council has made substantial
investments in more fuel-efficient and carbon-efficient equipment and
vehicles. ·
Changes in working practices throughout
2022/23 have resulted in operational efficiencies i.e. greater optimisation
of vehicles, with waste operators now servicing multiple sites. ·
The number of households in the borough
increased from 57,158 in 2018/19 to 58,776 in 2022/23 (+2.83%). ·
The amount of waste arisings in the
borough has also increased, with almost 1,000 additional tonnes of waste from
April to December 2023, compared with the same period in 2018. ·
As other councils have introduced waste
control measures to limit the amount of waste being disposed of from outside
their respective council areas, ‘Waste Tourism’ significantly increased,
particularly within the Carrickfergus area, with measures to address this being
investigated. As a
result, these two measures are deemed stopped and will not be reported in the
Performance Improvement Plan for 2024/25. Improvements
will continue to be made to the effectiveness and efficiency of our waste
operations, in line with changing legislation and environmental targets. |
|
|
Outcome 3 |
A more effective and efficient service
with increased customer satisfaction and value for money for ratepayers. |
Measure
1 |
Increased
rate of customer satisfaction. |
Status:
Achieved |
Surveys
conducted in 2021 and 2022 indicate an increase in customer satisfaction for
accessibility, movement around the site, and sufficient site size. |
Statutory Key Performance
Indicators
The Local Government
(Performance Indicators and Standards) Order (Northern Ireland) 2015 sets out
statutory indicators and standards for each local council.
The Department for the
Economy, the Department for Infrastructure, and the Department of Agriculture, Environment
and Rural Affairs collate this information, and publish the results.
We also publish this
information on our website at: www.midandeastantrim.gov.uk/performance
Statutory indicators and
standards 2023/24
The Department for Communities
set statutory targets for councils in the areas of Planning, Economic
Development and Waste Management. These are outlined in our annual business
plans and as far as possible, within our Improvement Objectives.
We also set our own internal
targets to ensure continuous improvement within these areas. Our results for
the period April 2023 to March 2024, are summarised below.
Indicator: The average
processing time of major planning applications
Target: A
maximum of 30 weeks. |
Year-end
result: 67.4
weeks. |
Status:
Not
achieved. |
Indicator: The average
processing time of local planning applications
Target:
A
maximum of 15 weeks. |
Year-end
result: 9.4
weeks. |
Status:
Achieved. |
Indicator: The percentage of
enforcement cases concluded within 39 weeks
Target:
A
minimum of 70%. |
Year-end
result: 87.3%. |
Status: Achieved. |
Indicator: The number of jobs
promoted through business start interventions
Target:
A
minimum of 85 jobs. |
Year-end
result: 103
jobs. (66 through
the Go for It programme, and 37 through Go Succeed). |
Status:
Achieved.
|
Indicator:
The percentage of household waste collected by district councils that is sent
for recycling
Target: A minimum of 50%. |
Year-end result: 50.7% |
Status: Achieved. |
Indicator:
The amount of biodegradable Local Authority Collected Municipal Waste that is
landfilled
Target: A maximum of 16,387 tonnes. |
Year-end result: 15,239 tonnes |
Status: Achieved. |
Indicator:
The amount (tonnage) of Local Authority Collected Municipal Waste Arisings
Target: A maximum of 75,797 tonnes. (The Department for Communities requires
that each council sets and monitors its own individual target for this
indicator annually). |
Year-end result: 74,842 tonnes |
Status: Achieved. |
The following pages analyse each of these indicators in
greater detail.
Economic
Development
Indicator:
The number of jobs promoted though business start interventions.
From
April 2023 to March 2024, 103 jobs were promoted across the borough, 66 through
the Go for It programme, and 37 through Go Succeed (which includes Enterprise
Pathways participants into employment), 21% over the annual standard of 85.
The
Northern Ireland Go for It business start-up programme
was succeeded by the newly established Go Succeed Entrepreneurial Support
Service in November 2023.
Go
Succeed offers a more tailored approach to entrepreneurial support compared to
its predecessor, and is structured around the four key pillars of Engage,
Foundation, Enabling Growth, and Accelerated Scaling. Each pillar is designed
to meet the evolving needs of entrepreneurs. Go Succeed offers specialised business
plans tailored to clients’ specific needs, including those anticipating staff
recruitment or VAT registration.
Due to
a significant bedding-in period from November 2023 to March 2024, a
comprehensive performance assessment will only be available after the first
evaluation period concludes at the end of March 2025. This timeframe is
essential for a thorough analysis, given the 18-month target set for the
programme.
We are
currently receiving monthly performance data, which is still under verification
and therefore not available for publication or cross-council comparison. To
ensure the accuracy and reliability of this data, an external evaluator has
been appointed.
Ongoing
discussions with the Department for the Economy aim to establish more
appropriate performance indicators for the new service, although no formal
agreements have yet been finalised.
While
early results are promising, a clear and complete understanding of the impact
and performance of Go Succeed will only be available when the initial
evaluation period concludes, and data is fully validated.
The number of jobs promoted through business start
interventions – Mid and East Antrim Borough Council (summary trend and
comparative analysis)
2023/24 Overview |
|||||
Standard 85 |
Result 103 |
NI
Council Position Not available |
%
Against Target 121% |
NI
Average Not
available |
Status /Trend Not
available |
Jobs promoted through business start
interventions – Mid and East Antrim Borough Council (annual results)
Annual
standard |
85 |
2019/20 |
122 |
2020/21 |
94 |
2021/22 |
109 |
2022/23 |
124 |
2023/24 |
103 |
Planning
In 2023/24, Mid and East
Antrim Borough Council remained within the standard set for two of the three
statutory planning indicators.
Our internal and comparative
performance is summarised below, and described in detail in the pages that
follow.
Mid and East Antrim Borough Council
planning results (summary trend and comparative analysis)
Indicator: The average processing time
of major planning applications. Standard: Less than 30 weeks. |
|||
Past results |
|||
2019/20 42.4 weeks |
2020/21 39.2 weeks |
2021/22 34.7 weeks |
2022/23 47.6 weeks |
2023/24 |
|||
Mid and East Antrim Borough Council
result 67.4 weeks |
Status and trend Target not achieved. Significant
decrease in performance from 2022/23. |
Northern Ireland council average 46.5 weeks |
Mid and East Antrim comparative
council position 9th |
|
|||
Indicator: The average processing time
of local planning applications. Standard: Less than 15 weeks. |
|||
Past results |
|||
2019/20 7.6 weeks |
2020/21 10.4 weeks |
2021/22 9.6 weeks |
2022/23 8.6 weeks |
2023/24 |
|||
Mid and East Antrim Borough Council
result 9.4 weeks |
Status and trend Target achieved. Slight decrease in performance from
2022/23. |
Northern Ireland council average 20.8 weeks |
Mid and East Antrim comparative
council position 1st |
|
|||
Indicator: Percentage of enforcement
cases concluded within 39 weeks. Standard: Greater than 70%. |
|||
Past results |
|||
2019/20 89% |
2020/21 82.6% |
2021/22 90.5% |
2022/23 91.2% |
2023/24 |
|||
Mid and East Antrim Borough Council
result 87.3% |
Status and trend Target achieved. Decrease in performance from 2022/23. |
Northern Ireland council average 74.2% |
Mid and East Antrim comparative
council position 3rd |
Indicator:
The average processing time of major planning applications.
Major planning applications comprise of
significant development projects that often have substantial impacts on the
environment, the community, and/or infrastructure, such as, large-scale housing
estates, commercial developments, or significant alterations to existing
structures.
These applications generally require
detailed assessments by statutory and other bodies, and are subject to
extensive scrutiny by a number of external consultees.
These include, environmental agencies (in
relation to sustainability and pollution), transport authorities (who assess
the impact on traffic and infrastructure), health and safety authorities (to
ensure regulatory compliance), utility companies (to review capacity and the
impact on existing services), and heritage bodies (to consider the impact on
historical sites).
These elements are beyond the direct
control of the Council, and can significantly impact application processing
times.
As a Council, we work to ensure alignment
with policies and community interests, and often consult with residents, community
groups, and businesses, which can further complicate and extend the process. Depending
on the nature of applications, specialist organisations may also be involved,
for example, to address specific concerns like flood risk, wildlife
conservation, or noise pollution.
In 2023/24, the average processing time of
major planning applications in Mid and East Antrim Borough Council was 67.4
weeks, rising from 47.6 weeks in 2022/23, and 34.7 weeks in 2021/22. The
average processing time among the 11 Northern Ireland councils during 2023/24
was 46.5 weeks.
The most recent increase in average
processing times in Mid and East Antrim can be attributed to the prolonged
review of an unusually complex application, which is now processed.
In 2023/24, we received 8 major planning
applications, adding to a number of applications remaining from previous years.
11.1% (1 of 9) were processed within the 30-week standard, against an average
of 36.8% across all councils.
Significant improvements were made in the
average processing times within some council areas. Antrim and Newtownabbey experienced
a reduction from 52.1 weeks in 2022/23 to 21.1 weeks in 2023/24, and Fermanagh
and Omagh from 64 weeks in 2022/23 to 22.9 weeks in 2023/24, both meeting the challenging
30-week target, alongside Armagh City, Banbridge and Craigavon council area.
That being said, one council area experienced an average processing time of
154.8 weeks, and another, 84.7 weeks.
These extended processing times may more
accurately reflect the challenges of managing complex applications, than
inefficiencies within council planning departments.
Meeting the 30-week standard, has been a
challenge over the last five years, and we have made representations to the
Department of Infrastructure to share our concerns. We are open to
collaborating with them, and other stakeholders, on alternative measures that
would allow for a fairer and more accurate metric for measuring success.
As we move into 2024/25, 8 applications
remain decision-pending, 6 from 2023/24, and 2 from 2022/23. Of these, 4 are
under review by various consultees, and cannot advance until all feedback and/or
decisions are received.
Standard |
30
weeks |
2019/20 |
42.4 weeks |
2020/21
|
39.2 weeks |
2021/22
|
34.7 weeks |
2022/23 |
47.6 weeks |
2023/24
|
67.4 weeks |
The
average processing time of major planning applications – By Northern Ireland
council (annual results)
Standard |
30 weeks |
|
Antrim and Newtownabbey Borough Council |
2022/23 52.1 weeks |
2023/24 21.1 weeks |
Ards and North Down Borough Council |
2022/23 104.5 weeks |
2023/24 84.7 weeks |
Armagh City, Banbridge and Craigavon Borough Council |
2022/23 47 weeks |
2023/24 27.6 weeks |
Belfast City Council |
2022/23 57.2 weeks |
2023/24 64.4 weeks |
Causeway Coast and Glens Borough Council |
2022/23 46.4 weeks |
2023/24 54.2 weeks |
Derry City and Strabane District Council |
2022/23 78 weeks |
2023/24 68.6 weeks |
Fermanagh and Omagh District Council |
2022/23 64 weeks |
2023/24 22.9 weeks |
Lisburn and Castlereagh City Council |
2022/23 87.2 weeks |
2023/24 56.4 weeks |
Mid and
East Antrim Borough Council |
2022/23 47.6 weeks |
2023/24 67.4 weeks |
Mid Ulster District Council |
2022/23 68.1 weeks |
2023/24 64 weeks |
Newry, Mourne and Down District Council |
2022/23 89 weeks |
2023/24 154.8 weeks |
Indicator:
The average processing time of local planning applications.
Local planning
applications comprise of smaller-scale developments or changes to properties,
such as residential extensions, minor commercial changes, or alterations to
existing buildings. These applications generally have a more straightforward
review process.
In
2023/24, the average processing time of local planning applications in Mid and
East Antrim was 9.4 weeks, significantly lower than the 15-week target. The
average processing time among the 11 Northern Ireland councils was 20.8 weeks,
with only 3 councils within target. Of the 11 councils, 8 experienced an
increase in processing times, and 3 experienced a reduction. Despite a slight
increase from 2022/23, Mid and East Antrim Borough Council ranked the
top-performing council for the fifth consecutive year. Our performance sets a
high standard in Northern Ireland, reflecting our commitment to the efficient
and timely processing of applications.
Standard |
30 weeks |
2019/20 |
7.6 weeks |
2020/21 |
10.4 weeks |
2021/22 |
9.6 weeks |
2022/23 |
8.6 weeks |
2023/24 |
9.4 weeks |
The average processing time of local planning
applications – By Northern Ireland council (annual results)
Standard |
30 weeks |
|
Antrim and Newtownabbey Borough
Council |
2022/23 13.4 weeks |
2023/24 13 weeks |
Ards and North Down Borough Council |
2022/23 19.9 weeks |
2023/24 16 weeks |
Armagh City, Banbridge and Craigavon
Borough Council |
2022/23 21.2 weeks |
2023/24 24.6 weeks |
Belfast City Council |
2022/23 19.8 weeks |
2023/24 20.6 weeks |
Causeway Coast and Glens Borough
Council |
2022/23 21.2 weeks |
2023/24 31.4 weeks |
Derry City and Strabane District
Council |
2022/23 21 weeks |
2023/24 23.4 weeks |
Fermanagh and Omagh District Council |
2022/23 13 weeks |
2023/24 13.2 weeks |
Lisburn and Castlereagh City Council |
2022/23 32.7 weeks |
2023/24 42.2 weeks |
Mid and East Antrim Borough Council |
2022/23 8.6 weeks |
2023/24 9.4 weeks |
Mid Ulster District Council |
2022/23 21.6 weeks |
2023/24 16.1 weeks |
Newry, Mourne and Down District
Council |
2022/23 21.6 weeks |
2023/24 33.7 weeks |
Indicator:
The percentage of enforcement cases concluded within 39 weeks.
This
indicator seeks to maintain public confidence in the planning system by
ensuring that development activities adhere to approved plans and regulations, thereby
protecting community and environmental interests.
Enforcement
cases typically involve addressing breaches of planning control. These may
include unauthorised building works (construction or significant alterations
without necessary planning permissions), change of use (of a building or land
without permission, such as, converting a residential property into a
commercial business), breach of conditions (failure to comply with conditions
attached to granted planning permission, such as incomplete landscaping) or non-compliance
with Planning Orders (failure to comply with enforcement notices or stop
orders, such as continuing construction).
In
2023/24, 87.3% of enforcement cases were concluded within 39 weeks within Mid
and East Antrim Borough Council, significantly higher than the 70% minimum standard,
and well above the Northern Ireland council average of 74.2%. Of the regional
councils, 7 achieved the target, with Mid and East Antrim Borough Council
ranking third, behind Antrim and Newtownabbey Borough Council and Belfast City
Council.
At the
time of publishing our Self-Assessment Report for 2022/23, the Department for
Infrastructure had not yet released annual data for this indicator. This data
has now been published, and despite a decline from 89.5% in 2022/23, we remain
within the top performing councils in the region for this indicator.
The
percentage of enforcement cases concluded within 39 weeks – Mid and East Antrim
Borough Council (annual results)
Standard |
Within 39 weeks |
2019/20 |
89% |
2020/21 |
82.6% |
2021/22 |
90.5% |
2022/23 |
89.5% |
2023/24 |
87.3% |
The
percentage of enforcement cases concluded within 39 weeks – By Northern Ireland
council (annual results)
Standard |
Within 39 weeks |
|
Antrim
and Newtownabbey Borough Council |
2022/23 91.2% |
2023/24 96% |
Ards
and North Down Borough Council |
2022/23 62.9% |
2023/24 55.7% |
Armagh
City, Banbridge and Craigavon Borough Council |
2022/23 70.6% |
2023/24 82.7% |
Belfast
City Council |
2022/23 88.8% |
2023/24 88.6% |
Causeway
Coast and Glens Borough Council |
2022/23 67.7% |
2023/24 58.7% |
Derry
City and Strabane District Council |
2022/23 74.9% |
2023/24 75% |
Fermanagh
and Omagh District Council |
2022/23 74.1% |
2023/24 79.6% |
Lisburn
and Castlereagh City Council |
2022/23 80% |
2023/24 83.2% |
Mid
and East Antrim Borough Council |
2022/23 89.5% |
2023/24 87.3% |
Mid
Ulster District Council |
2022/23 46.4% |
2023/24 58.8% |
Newry,
Mourne and Down District Council |
2022/23 58.6% |
2023/24 60% |
Waste Management
We also monitor three
statutory waste management indicators on the amount of waste collected by the
Council, the amount of household waste that is sent for recycling, and the
amount of biodegradable waste that is sent to landfill.
The results for the period
April 2023 to March 2024 are summarised below. We remain within the standard
set for all three indicators.
The figures presented are
provisional, pending audit and verification by the Northern Ireland Environment
Agency.
Mid and East Antrim Borough
Council Waste Management results (summary trend and comparative analysis)
Indicator: |
The percentage of household waste
collected by councils that is sent for recycling. |
|||
Annual standard: |
A minimum of 50%. |
|||
Past results |
||||
2019/20 51.4% |
2020/21 50.8% |
2021/22 51.9% |
2022/23 51.4% |
|
2023/24 |
|
|||
Mid and East Antrim Borough Council result 50.7% |
Status and trend Target achieved. Slight decrease in performance from
2022/23. |
Northern Ireland council average 51.6% |
Mid and East Antrim comparative council position 6th |
|
Indicator: |
The amount of biodegradable Local
Authority collected municipal waste that is landfilled. |
||
Annual standard: |
A maximum of 16,387 tonnes. |
||
Past results |
|||
2019/20 13,684 tonnes |
2020/21 14,508 tonnes |
2021/22 14,528 tonnes |
2022/23 14,599 tonnes |
2023/24 |
|||
Mid and East Antrim Borough Council result: 15,239 tonnes |
Status and trend: Target achieved. Slight decrease in performance from
2022/23. |
Northern Ireland council average: Not available |
Mid and East Antrim comparative council position: Not available |
|
The
amount of Local Authority collected municipal waste arisings. |
||
Annual
standard: |
A
maximum of 75,797 tonnes. |
||
Past results |
|||
2019/20 73,797 tonnes |
2020/21 78,986 tonnes |
2021/22 76,689 tonnes |
2022/23 73,433 tonnes |
2023/24 |
|||
Mid and East Antrim Borough Council result: 74,842 tonnes |
Status and trend: Target achieved. Slight decrease in performance from
2022/23. |
Northern Ireland council average: Not available |
Mid and East Antrim comparative council position: Not available |
Indicator: The percentage of
household waste collected by council that is sent for recycling.
We have collected more than
the minimum 50% household recycling standard every year since 2017/18. At
50.7%, recycling rates were lower in 2023/24, compared with 2022/23 and
2021/22, with a significant reduction experienced within the final six months
of the year.
Levels of recycling can be
impacted by household behaviours, holiday periods, and seasonal waste
generation.
Rates are monitored by the
Council every quarter, with a downward trend normally experienced in the final
quarter of the year (January to March). However, 2023/24 saw a marked decrease
in recycling within quarter three (October to December) and quarter four, with
the lowest levels recorded within the last five years.
A downward trend in rates of
household recycling has been noted across Northern Ireland councils, as
observed at a recent meeting of the National Communications Advisory Panel. We
are one of seven local councils to meet the target in 2023/24, with rates
ranging from 60.9% to 41.1%.
Household recycling has been
impacted by the cost-of-living crisis, where financial concerns have taken
precedence, and throughout the pandemic, when health and safety were
prioritised.
We have taken a number of
steps to positively influence recycling rates within the borough, as follows:
·
We are working with the regional Waste
Resources Action Programme (WRAP) to co-design and promote waste and recycling
communications campaigns, ensuring consistent messaging across all local
councils, such as Food Waste Action Week (March 2023) and Recycle
Week (October 2023), which were supplemented by smaller campaigns delivered
throughout the year.
·
We support the Eco-Schools Programme, in
partnership with Keep Northern Ireland Beautiful. This programme works with
local schools to foster environmental awareness from a young age, and addresses
waste management and litter. We hope to increase the number of schools with
Green Flags by 5% by the end of June 2025, as part of our Performance
Improvement Plan for 2024/25.
·
We also hold community engagement sessions on
Waste and Recycling each year with organisations such as businesses, community
groups, sports clubs, and church groups. We hope to deliver at least 10 of
these by the end of March 2025, as part of our Performance Improvement Plan for
2024/25.
·
We also provided a response to the recent Department
for Agriculture, Environment and Rural Affairs Rethinking our Resources:
Measures for Climate Action and the Circular Economy in NI consultation, which
focused on how to increase recycling performance and engagement with both the
household sector and the business sector.
The percentage of household
waste collected that is sent for recycling (including waste prepared for re-use)
– Mid and East Antrim Borough Council (annual results)
Annual Standard |
50% |
2019/20 |
51.4% |
2020/21 |
50.8% |
2021/22 |
51.9% |
2022/23 |
51.4% |
2023/24 |
50.7% |
The percentage of household waste collected that is sent for recycling (including
waste prepared for re-use) – By Northern Ireland council (annual results)
|
50% |
||||
Antrim and Newtownabbey Borough Council |
2019/20 57.30% |
2020/21 54.45% |
2021/22 60.20% |
2022/23 61.44% |
2023/24 60.9% |
Ards and North Down Borough Council |
2019/20 54.70% |
2020/21 50.97% |
2021/22 48.34% |
2022/23 52.33% |
2023/24 55.1% |
Armagh City, Banbridge and Craigavon
Borough Council |
2019/20 54.80% |
2020/21 54.34% |
2021/22 53.88% |
2022/23 55.41% |
2023/24 55.6% |
Belfast City Council |
2019/20 45.40% |
2020/21 43.13% |
2021/22 40.96% |
2022/23 41.51% |
2023/24 41.1% |
Causeway Coast and Glens Borough Council |
2019/20 53.80% |
2020/21 53.86% |
2021/22 52.25% |
2022/23 55.01% |
2023/24 49.6% |
Derry City and Strabane District Council |
2019/20 44.20% |
2020/21 46.13% |
2021/22 45.08% |
2022/23 45.74% |
2023/24 48.2% |
Fermanagh and Omagh District Council |
2019/20 49.10% |
2020/21 47.13% |
2021/22 47.73% |
2022/23 48.43% |
2023/24 46.7% |
Lisburn and Castlereagh City Council |
2019/20 50.80% |
2020/21 50.40% |
2021/22 49.72% |
2022/23 50.28% |
2023/24 50.9% |
Mid and East Antrim Borough Council |
2019/20 51.40% |
2020/21 50.80% |
2021/22 51.92% |
2022/23 51.39% |
2023/24 50.7% |
Mid Ulster District Council |
2019/20 58.80% |
2020/21 58.91% |
2021/22 58.21% |
2022/23 58.71% |
2023/24 58.6% |
Newry, Mourne and Down District Council |
2019/20 53.70% |
2020/21 52.62% |
2021/22 49.83% |
2022/23 50.30% |
2023/24 50.0% |
Indicator: The amount
(tonnage) of biodegradable local authority collected municipal waste that is
landfilled.
In 2023/24, the amount of
biodegradable waste collected that was sent to landfill increased to 15,239
tonnes. This is up 4.7% from the previous year and is the fourth consecutive
rise in the borough since 2019/20.
Biodegradable waste includes,
textiles, organic (food waste and green garden waste), wood, paper, and
cardboard. The amount recorded in 2023/24 is lower than the 16,387
tonne allowance set by the Northern Ireland Landfill Allowance Scheme, which
was in place until 2019/20. Until clarity is provided on this indicator, we
continue to use this allowance as an internal target.
A number of practices are in
place to help to reduce the amount of biodegradable waste in the borough that
is sent to landfill, such as organic waste and dry recycling kerbside
collections, textile and wood disposal services, and various communications campaigns
which are delivered throughout the year.
The amount (tonnage) of
biodegradable local authority collected municipal waste that is landfilled –
Mid and East Antrim Borough Council (annual results)
2019/20 |
Target: 16,387 |
Achieved: 13,684 |
2020/21 |
Target: 16,387 |
Achieved: 14,508 |
2021/22 |
Target: 16,387 |
Achieved: 14,528 |
2022/23 |
Target: 16,387 |
Achieved: 14,559 |
2023/24 |
Target: 16,387 |
Achieved: 15,239 |
Indicator: The amount of local
authority collected municipal waste arisings.
This indicator relates to the
total quantity of waste collected by the Council, both recyclable and
non-recyclable, from households, businesses, and institutional sources within
our area.
There was a modest increase in
the volume of collected municipal waste arisings to 74,824 tonnes in 2023/24,
representing a 1.9% rise from the previous year.
No statutory standard is set
for this indicator, as we are obligated to collect the amount of waste
presented at the kerbside, household recycling centres, and commercial waste.
We have developed various approaches
to positively influence environmental practices within the borough, as outlined
within our Corporate Plan, and Climate and Sustainability Action Plan (2023-2027).
We also deliver a number of
programmes to support local communities and to promote re-use, such as:
·
Our Christmas Toy Container Scheme, operating
for the fifth year, which gifted to local communities and diverted over 3
tonnes from landfill.
·
Our School Uniform Scheme, which runs
throughout the summer, saw local citizens donate or pick up school uniforms and
school-related items, supporting our communities in a time of significant
financial pressure, and diverting waste from potential landfill.
We hope to deliver 5 similar
circular economy initiatives throughout 2024/25, as part of our Performance
Improvement Plan.
Local authority collected municipal
waste arisings – Mid and East Antrim Borough Council (annual results)
2019/20 |
73,797 tonnes |
2020/21 |
78,986 tonnes |
2021/22 |
76,689 tonnes |
2022/23 |
73,433 tonnes |
2023/24 |
74,824 tonnes |
Self-Imposed Performance
Indicators and Standards
Self-imposed indicators and
standards are how we have decided, as a Council, to measure our performance.
These indicators primarily
relate to our Corporate Plan (at strategic level), and annual business plans
(at operational level).
On the successful delivery of
our Corporate Plan for 2019-2023, an interim plan was adopted for the 2023/24
financial year. This gave our new Elected Members the opportunity to feed into
the new four-year plan, before it was officially adopted in May 2024.
Our Corporate Plan is based on
a body of evidence which helps to identify our medium-term priorities and focus.
To ensure the plan’s delivery, its objectives guide our annual business
planning process.
Business plans outline each
service area’s key actions for delivery within the year ahead, and sometimes
beyond. To ensure these actions contribute to wider, longer-term outcomes for
citizens, they fully align with each element of our Performance Management
Framework.
The pages that follow
summarise our performance in delivering our interim plan for 2023/24.
Our Corporate Plan for 2023/24
Our interim Corporate Plan was
designed to support the delivery of the Community Plan, sharing the same vision
and aligning with its themes and priorities.
Our strategic priorities for
the year were:
·
Jobs and Tourism
·
Community Safety and Cohesion
·
Learning for Life
·
Good Health and Wellbeing
·
High Performing and Sustainable Council
·
Our Environment
Performance Summary
To support the delivery of our objectives and associated
actions, we established 61 performance measures. At the end of the year:
·
75% were achieved or on track.
·
12% were delayed but progressing.
·
13% were not achieved.
These are discussed in detail
in the pages that follow.
Our Highlights
A snapshot of some key activities
delivered over the year is provided below. These actions helped to enhance
community bonds, drive economic growth, and enrich the overall quality of life
for everyone living, working, visiting, and doing business in our borough. Highlights
included:
·
3.2
tonnes of toys were donated through our Christmas Toy Container Project.
·
5,368
items were collected through the School Uniform Scheme, benefitting 1,676
children and young people.
·
45,250
attendees enjoyed 18 Council organised events.
·
150,000
visitors were welcomed at our key tourist attractions.
·
2,554
individuals participated in 88 outdoor recreation programmes.
·
60,512
trees were planted across the borough.
·
£260,000
grant funding was awarded to local groups across the borough.
·
17
work placements were facilitated across various Council departments.
·
12,788
tonnes of materials were processed through our Household Recycling Centres.
·
384
home safety checks were carried out across the borough.
·
14
community planning initiatives were delivered.
·
795
businesses engaged through a variety of economic support programmes.
·
14
Autism Awareness workshops were delivered.
·
9,755
individuals took part in 1,308 MEActive sessions.
·
416
participants were supported through employability programmes, resulting in 340
qualifications and 182 jobs.
Strategic Theme 1: Jobs and Tourism
Our strategic objectives were:
·
To position and promote Mid and East Antrim as
a dynamic, outward-looking region that welcomes and supports inward investment.
·
Through a variety of support programmes, grow,
support and sustain new and existing businesses.
·
To drive inclusive and sustainable economic
growth through investing in our people, our places and our businesses.
·
To create a compelling tourism proposition by
investing in the development and promotion of our unique cultural, arts and
heritage assets.
·
To attract more domestic and international
visitors to the borough to stay longer and spend more.
At the end of the year:
·
67% of our measures were achieved.
·
22% were delayed but progressing.
·
11% were not achieved.
Our performance is explained in the pages that follow.
Action 1 |
Continue
to progress the development of the i4C Innovation and CleanTech Centre to
support businesses and create jobs. |
Measure 1 |
To
secure Outline Business Case Approval for i4C and HyTech
by 31 March 2024. |
Status:
Delayed
but progressing |
The new i4C Innovation and CleanTech Centre, a
£23.5m, 7,000m2 facility focusing on hydrogen innovation, is set
to open in Ballymena in 2027, as part of the Belfast Region City Deal. The
Outline Business Case for the project has been approved, and the HyTech NI Outline Business Case is under appraisal. |
Action 2
|
Deliver
a suite of business support programmes and projects designed to support
business start-up and growth across the borough. |
Measure
1 |
400
businesses engaged across business support programmes by 31 March 2024. |
Status:
Achieved |
Between April 2023 and March 2024, 795 local
businesses benefited from a range of support programmes, aimed at start-ups
and existing businesses. The programmes included:
·
Go for It, Go Succeed and SPARK:
Assisted new entrepreneurs in launching their ventures.
-
Escalator: Helped existing businesses scale
their operations. -
The MEA Food and Drink Network: Focused
on businesses within the food and drink sector. - Digital
Surge: Helped enhance digital capabilities. Additional initiatives focusing on town
centre development were also implemented:
|
Measure 2 |
85 jobs
promoted through business start interventions by 31 March 2024. |
Status:
Achieved |
Between April 2023 and March 2024, there were
103 jobs promoted through business start interventions, 66 through the Go for
It programme and 37 through Go Succeed (including Enterprise Pathways
participants into employment). Go Succeed is the new Northern Ireland
Entrepreneurship Support Service, which launched in November 2023. |
Action 3
|
Develop
a dynamic 5-year tourism strategy that will drive economic growth, job
creation and a thriving tourism economy. |
Measure
1 |
Welcome
at least 83,000 visitors to strategic visitor attractions (Carrickfergus
Castle, The Gobbins, US Rangers Museum, Andrew Jackson Cottage and Arthur
Cottage) by 31 March 2024. |
Status: Achieved |
We welcomed 98,455 visitors across the Council’s
strategic visitor attractions. |
Measure
2 |
At least
7 businesses signed up to Discover NI by 31 March 2024. |
Status: Achieved |
We are currently unable to get a final year-end
figure as this data is provided by a third party. However, the most recent
available figure shows that 26 businesses had signed up, therefore the target
of 7 has been exceeded. |
Measure
3 |
Support
businesses to develop at least 5 new tourism products by 31 March 2024. |
Status: Not achieved |
Unfortunately, during the reporting period,
no funding was made available to pursue this objective. Officers continue to work
with key agencies on funding updates and opportunities. |
Action 4
|
Progress
the delivery of the Council’s 10-year vision for the three town centres to
develop, regenerate and attract inward investment. |
Measure
1 |
To finalise
the development of the Town Centre Revitalisation Scheme and complete
delivery of year 1 actions by 31 March 2024. |
Status: Achieved |
The first application for funding was
successful, with a Letter of Offer received for over £400k. A second
application was also successful, with a Letter of Offer for £54k received for
street art within Ballymena and Larne. A further three funding applications
are scheduled to be submitted in the 2024/25 year. Some key highlights
included: ·
89 businesses availed of funding through
the Shopfront Revitalisation Scheme. ·
Pop-up shops are fully operational in
each of the borough’s main towns. ·
The procurement of town centre sound
systems for Ballymena and Carrickfergus, with installation planned before the
end of September 2024. ·
13 businesses benefited from the
provision of pavement café furniture. A Steering Group, which consists of the
Department for Communities, Council officers and community and business
representatives, continues to meet monthly. |
Measure
2 |
Deliver
the Public Realm Improvement Scheme by 31 March 2024. |
Status: Achieved |
Public realm improvement projects were
delivered at Point Street in Larne and Castle Street in Ballymena. Works
completed at Larne in May 2023 and at Ballymena in January 2024. |
Measure
3 |
Support businesses
to deliver the Townscape Heritage Initiative by 30 September 2023. |
Status: Delayed but progressing |
Carrickfergus Townscape Heritage Initiative,
supported by funding from The National Lottery Heritage Fund and building
owners, is an ambitious regeneration scheme breathing new life into the
town’s conservation area, maintaining heritage, boosting tourism and growing
the local economy. The tenth and
final property of regeneration under the initiative is due to complete by the
end of October 2024. Delays were experienced due to adverse weather
conditions and complex design challenges. A post project evaluation, closing event and
publication on the scheme will be delivered on completion. The project will be reported against in 2024/25 and
is included within the Council’s annual Performance Improvement Plan. |
Strategic Theme 2: Community
Safety and Cohesion
Our strategic objectives were:
We
will work alongside partners:
·
To encourage good relations, civic pride and a
sense of belonging by creating vibrant, shared, cohesive and inclusive
communities across the borough.
·
To build the capacity of local communities to
improve resilience and self-sustainability.
·
To improve community safety and confidence,
enabling people to feel and be safe by providing
early intervention and supporting those most at risk of becoming involved in
crime.
·
To provide support to vulnerable people who
need it.
At the end of the year:
·
69% of our measures were achieved.
·
31% were not achieved.
Our performance is explained in the pages that follow.
Action 1 |
Through
the delivery of various programmes, support our local communities to improve
their resilience and build self-sustainability. |
Measure 1 |
Continue
to support the Regional Community Resilience Group (RCRG) to identify, review
and shape proposals for the next phase of the RCRG priorities by 31 March
2024. |
Status:
Achieved |
Our Corporate and Community Resilience
Officer and local groups have developed a resource toolkit aimed at improving
community preparedness for extreme weather events. As the strategic proposals
for the RCRG extend into the 2024/25 period, there are no further inputs
required from the Council at this stage. Our involvement in the pilot ensures
that the Council can significantly contribute to regional resilience
planning. |
Measure 2 |
Review
the existing MEA Community Resilience Framework and requirement for an MEA
Community Resilience Action Plan in tandem with the RCRG proposals by 31
March 2024. |
Status: Achieved |
In collaboration with Community Resilience
groups across the borough, the Council engaged in a joint study funded by the
RCRG alongside Derry City and Strabane District Council. This study
successfully identified five key elements that characterise a resilient
community and underscore the pivotal role these communities play in ensuring
preparedness, response, and recovery from severe disruptions. The findings
are set to guide the future strategies of the RCRG as it aligns more closely
with the broader objectives of the Civil Contingencies Framework. The Council secured funding that enabled the
Mid and East Antrim Community Resilience groups to develop a resilience
toolkit and framework via community workshops. |
Action 2 |
Deliver
comprehensive Good Relations activities, with the aim of influencing positive
changes to attitudes and knowledge. |
Measure
1 |
Deliver
the agreed Good Relations Action Plan by 31 March 2024. |
Status: Achieved |
During the year, the Good Relations budget
was reduced by 47%, which prompted a reprofiling and resubmission of the
Action Plan. Two key initiatives, the Beacon project and the Integrate
project, were prioritised and delivered, leading to the fulfilment of the
revised Action Plan. |
Measure
2 |
Deliver
at least 2 Good Relations projects by 31 March 2024. |
Status: Achieved |
The
Beacon project and the Integrate project were both successfully delivered. It
should be noted that both were single identity projects, which affected the
achievable percentages in the following measures. |
Measure
3 |
At least
50% of participants in Good Relations activities stating that their attitude
towards people from different religious backgrounds has improved by 31 March
2024. |
Status: Not achieved |
38% of participants
stated that their attitude towards people from different religious
backgrounds had improved. |
Measure
4 |
At least
50% of participants in Good Relations activities stating that their attitude
towards people from different ethnic backgrounds has improved by 31 March
2024. |
Status: Not achieved |
30% of participants stated that their
attitude towards people from different ethnic backgrounds had improved. |
Measure
5 |
At least
50% of participants in Good Relations activities stating that their knowledge
of cultural traditions or backgrounds has increased by 31 March 2024. |
Status: Not achieved |
31% of participants stated that their
knowledge of different cultural traditions or backgrounds had increased. |
Action 3 |
Work in partnership
with the Poverty Action Group to progress initiatives to support the most
vulnerable across the borough. |
Measure
1 |
Conduct
a review of the Safe, Warm and Well Programme delivery model by 31 March
2024. |
Status: Achieved |
The
review of the Safe, Warm and Well Programme was completed, and the report was
presented to the Council’s Neighbourhoods and Communities Committee in
December 2023. Despite
Elected Members' support and the Council engaging with the Public Health
Agency (PHA), no additional budget has been allocated for 2024/25, leading to
scaled-back targets for the delivery of PHA initiatives. A process of
continuous review will be implemented to prioritise spending and maximise the
impact of the programme moving forward. |
Measure
2 |
Deliver
90% of the Public Health Agency target for the over 65s home safety checks by
31 March 2024. |
Status: Achieved |
Between
April 2023 and March 2024, 397 home safety checks were carried out, equating
to 168% of the target. |
Measure
3 |
Deliver
90% of the Public Health Agency target for energy efficiency support by 31
March 2024. |
Status: Achieved |
Between
April 2023 and March 2024, the Health and Wellbeing team received 391
referrals, equating to 134% of the target. |
Measure
4 |
Support
the Poverty Action Group by ensuring continued presence and contribution to
meetings by 31 March 2024. |
Status: Achieved |
During the summer we once again ran the
highly successful School Uniform Scheme. The scheme was delivered in
partnership with Mid and East Antrim Community Advice Services (MEACAS) and
was supported by the Mid and East Antrim Poverty Action Group (MEAPAG). MEAPAG act as our vehicle for the delivery of
the Hardship Fund and in partnership with the Affordable Food Club, they have
been able to deliver several support schemes. In addition to the new work
within the scope of the Hardship Fund, the members of the MEAPAG continue to
support each other and act as referral agents for available support. |
Action 4 |
Through
the Loneliness Network collaborate with statutory and voluntary partners and
community groups to promote and deliver initiatives to tackle loneliness in
the borough. |
Measure
1 |
At least
40 partner organisations engaged in the network by 31 March 2024. |
Status: Achieved |
We have
engaged with over 40 partner organisations. |
Measure
2 |
At least
40 support programmes delivered by 31 March 2024. |
Status: Not achieved |
The Loneliness Network in Mid and East Antrim
was launched in 2019 to create coordinated action, raise awareness, share
best practice and encourage learning and prevention across the borough. The
network brings together the Council and the Northern Health and Social Care
Trust, alongside other statutory, voluntary and community groups. Although resource constraints prevented the
target of 40 programmes being delivered, 27 programmes aimed at enhancing
community engagement and support were successfully delivered. These initiatives included: ·
The installation of 6 chatty benches and
2 chatty cafés. ·
The placement of 3 kindness post-boxes
to boost community spirit. ·
The appointment of 6 loneliness
champions. ·
The delivery of 5 activity programmes to
engage the community. ·
The launch of a Facebook page to enhance
online presence. ·
The organisation of a photography
exhibition. ·
The setting up 3 information stands at
roadshows to share community information. |
Strategic Theme 3: Learning
for Life
Our strategic objectives were:
·
To develop the skills needed to embrace
opportunities for a prosperous and more sustainable future.
·
Through our various programmes, develop a sense
of ambition towards achievement regardless of location, community background or
socio-economic factors.
·
To promote to stakeholders the benefits of
creating volunteer and enhanced work experience opportunities.
·
To lead by example by developing and
implementing a work placement programme within the Council.
·
To support our staff to achieve their full
potential by investing in training, development and cross Council collaborative
opportunities.
At the end of the year:
·
100% of our measures were achieved.
Our performance is explained in the pages that follow.
Action 1 |
Deliver
a suite of employability programmes to support our citizens to develop their
skills, gain qualifications and secure employment. |
At
least 140 participants in employability interventions and academies by 31
March 2024. |
|
Status: Achieved |
Between April 2023 and March 2024, 268 people
participated in employability interventions and academies. |
Measure
2 |
At least
80 qualifications achieved by participants in employability interventions and
academies by 31 March 2024. |
Status: Achieved |
Participants achieved 319
qualifications through employability interventions and academies. |
Measure 3 |
At least
80 participants gaining employment or self-employment as a result of
employability interventions and academies by 31 March 2024. |
Status: Achieved |
Between
April 2023 and March 2024, 101 participants progressed into employment or self-employment
as a result of employability interventions and academies. |
Action 2 |
Position Mid and East Antrim Borough
Council as an employer of choice by providing opportunities for work
placement or work experience. |
Measure
1 |
Deliver at least 8 work experience or work placements by 31 March
2024. |
Status:
Achieved |
We facilitated 17 work placement and
volunteer opportunities across the Council, including within Museums, Parks,
Capital Works, Sustainability, Planning and Building Control, and the
Gobbins. |
Action 3 |
Deliver a suite of environmental
education programmes for citizens, businesses and young people across the
borough. |
Measure
1 |
Deliver 8 climate and sustainability
education programmes across schools, communities and businesses by 31 March
2024. |
Status:
Achieved |
Our
Climate and Sustainability officers delivered a range of educational and
engagement programmes promoting sustainable practices and encouraging greater
awareness of our environmental impact. 1.
Eco-Schools Programme: The Council supports
76 schools registered through financial backing, educational talks, and
partnerships. This support has led to 20 schools achieving Green Flag status,
36 receiving silver certificates, and 7 earning bronze certificates. 2.
Community Education: Talks on climate
and sustainability, waste and recycling were delivered to various community
groups across the borough. 3.
Business Communication: Monthly e-zines
provided educational information on funding, training, and support to
businesses across the borough. 4.
Student Placement: We facilitated a
placement student from Queen’s University Belfast, who contributed to
ISO14001, the Plot to Plate PeacePlus review, and various other projects. 5.
Eco-Homes Programme: The Council is
collaborating with Keep Northern Ireland Beautiful and The Energy Team from
the Republic of Ireland to enhance and promote the Eco-Homes Programme, which
assists residents in adopting renewable technologies and accessing funding. 6.
ISO14001 Re-use Event: A new objective
under ISO14001 was successfully achieved by hosting a re-use themed webinar, with
good attendance from our staff. 7.
Development of ECOS as a Sustainability
Hub: Work continues to transform ECOS into a hub for educational and
sustainability activities, with recent activities including a schools
competition judged in partnership with Economic Development, with a tour for
the winning school. 8.
MEANZ Business Project: The Mid and East
Antrim Net Zero (MEANZ) Business project, funded by Innovate UK, is
spearheading an innovative and comprehensive programme of engagement, support
and dissemination to businesses across the borough, centred around delivering
net zero. 9.
Re-use Schemes: Designed to promote the
development of a circular economy, initiatives have included the School
Uniform Scheme, Christmas Toy Container Project and the Community RePaint Scheme. |
Action 4 |
Develop
Mid and East Antrim Borough Council employees to deliver high quality and
responsive services to citizens through the provision of comprehensive and
bespoke training. |
Measure 1 |
Ensure
at least 1.5 days are spent, per full-time equivalent, on employee learning
and development by 31 March 2024. |
Status: Achieved |
We spent 3.46 days, per full-time equivalent on
employee learning and development. |
Measure 2 |
Deliver
at least 100 training courses to staff by 31 March 2024. |
Status: Achieved |
Between April 2023 and March 2024, 296 courses
were completed, encompassing mandatory and skills development categories.
These included a variety of topics, such as:
|
Strategic Theme 4: Good Health
and Wellbeing
Our strategic objectives were:
·
To deliver a coordinated partnership approach
to improve the physical, mental and emotional health and wellbeing of our
citizens.
·
To ensure our citizens and visitors have
accessible and inclusive Council facilities.
·
To enable vulnerable groups within our borough
to be active, respected and supported in their community.
·
To encourage our staff to use the resources and
tools available to improve and maintain their physical, mental, and emotional health and
wellbeing.
At the end of the year:
·
73% of our measures were achieved.
·
18% were delayed but progressing.
·
9% were not achieved.
Our performance is explained in the pages that follow.
Action 1 |
Support our citizens to lead healthy
and active lives by increasing our offering of physical activity sessions and
support schemes across the borough. |
Measure 1 |
Launch the MEAqua Strategy and Action
Plan 2023-2025, including delivery of first year actions by 31 March 2024. |
Status: Delayed but progressing |
Delivery
of the MEAqua Strategy and Action Plan 2023-2025 is underway, with
significant progress made in its first year. Key accomplishments include: ·
The appointment of additional qualified
swimming teachers. ·
The introduction of parent and toddler
swimming lessons at all three leisure centres. ·
£4,000 of funding secured from
Disability Sport NI for the purchase of sensory equipment for the MEAqua Swim
Academy. ·
The expansion of the programme to
include the summer months at all three leisure centres. The
programme has seen tremendous growth, with participation more than doubling
since September 2021, now boasting 296 classes and 2,075 participants per
week. The implementation of the strategy will continue as part of the Council’s
Performance Improvement Plan for 2024/25. |
Measure 2 |
Deliver the MEActive programme by 31
March 2024. |
Status: Achieved |
We
offered 1,389 sessions, including activities such as dodgeball, basketball, pilates, danderball, boccia,
pickleball, and walking netball. Out of the 10,157 participants who joined
these sessions, 5,675 were women and girls. We also provided inclusive
opportunities for 3,484 individuals living with a disability or lifelong
illness. The programme has been supported by 474 different groups. |
Measure 3 |
Continue to support the delivery of the
Move More programme by 31 March 2024. |
Status: Achieved |
In collaboration with Macmillan Cancer
Support, our Move More programme offers a free tailored programme to help
individuals suffering from cancer to get and stay active at a level that is
right for them. 1,809 individuals were offered opportunities to participate,
and we delivered 418 classes. |
Measure 4 |
Continue to support the delivery of the
GP Referral Scheme by 31 March 2024. |
Status: Achieved |
Delivered
in partnership with the Public Health Agency, PARS is a 12-week prescribed
physical activity programme. The scheme received 227 referrals, of which 64
are active. Of those approved for participation, 52 completed it. |
Action 2 |
Develop an Age-Friendly Action Plan to
ensure our older citizens feel supported and included within their local
communities. |
Measure 1 |
Establishment of an MEA Age-Friendly
Alliance by 30 December 2023. |
Status: Achieved |
The MEA Age-Friendly Alliance has been
established, with the first meeting held in November 2023 and the second in
January 2024. |
Measure 2 |
Development of an MEA Age-Friendly
Action Plan by 31 March 2024. |
Status: Delayed but progressing |
A
public consultation on the draft plan took place from 5 April to 31 May 2024.
A workshop was held in June to analyse feedback, with subsequent amendments
made following a meeting in July. The launch of the plan is now scheduled for
October 2024, to coincide with Positive Ageing Month. The
project continues within the Council’s Performance Improvement Plan for 2024/25. |
Action
3 |
Develop
a borough-wide Landlord Forum to encourage the provision of quality housing. |
Measure
1 |
Development
of a borough-wide Landlord Forum by 31 March 2024. |
Status: Achieved |
The
Landlord Forum, featuring representatives from the Landlord Association (NI)
and the Chartered Institute of Housing is now fully established. Arrangements for the Mid and East Antrim Landlord
Forum to act as a subgroup of the Landlord Association (NI) are now in place. The
Council will step back from its leadership role but will continue to provide
appropriate support to the Forum, and will review this within 12 months. We
will also continue to engage with community-led initiatives with the aim of
achieving sustainable environmental improvements. |
Action 4 |
Encourage the use of outdoor spaces for
health and wellbeing, through the delivery of our Outdoor Recreation
strategy. |
Measure 1 |
Deliver at least 3 outdoor recreation
programmes by 31 March 2024. |
Status: Achieved |
The
Natural Connections Photography initiative provided teenagers with the
opportunity to connect with nature, and each other, through a series of
workshops, culminating in a presentation of their work at Carrick Town Hall. The
Healthy Oceans Healthy Minds campaign, a collaboration with Live Here Love
Here, included 6 sessions over 3 weeks with activities such as Beach Babbies,
Rockpool Safari, Stand Up Paddleboarding, Pollution Art, and Seaweed Tasting.
The Plot
to Plate programme was also successfully delivered, focusing on sustainable
food practices from cultivation to consumption. |
Measure 2 |
Support at least 60 participants in
citizen focused health and wellbeing programmes by 31 March 2024. |
Status: Achieved |
Between
April 2023 and March 2024, 194 people took part in citizen focused health and
wellbeing programmes. |
Action 5 |
Ensure we continue to provide reliable,
value for money services to our citizens by focusing on the health and
wellbeing of our employees, and through the management of employee
attendance. |
Measure 1 |
Ensure absence levels do not exceed 14
days per annum, per full-time equivalent, by 31 March 2024. |
Status:
Not achieved |
A final absence rate of 16.46 days per full
time equivalent was recorded, which although an improvement on last year, did
not meet the target set. The high rate has been influenced by
ongoing difficulties in accessing medical consultations and treatments,
leading to extended periods of absence for many employees. Unfortunately,
there has also been a significant increase in the diagnosis of severe health
issues among staff. A scrutiny review of absenteeism is
currently being conducted by our Audit and Scrutiny Committee.
|
Measure 2 |
Deliver at least 2 health and wellbeing
initiatives for staff by 31 March 2024. |
Status: Achieved |
We have
delivered several initiatives aimed at supporting the mental health and
wellbeing of staff. These included Health and Wellbeing Week, Be Kind to Your
Mind and Stress Awareness and Management. We also enhanced support through
the StayWell Hub, which provides staff with access to mental health support
and free training. |
Strategic Theme 5: High
Performing and Sustainable Council
Our strategic objectives were:
·
To take the lead on delivering both the
Community Plan and the Local Development Plan, working effectively with our
partners and citizens.
·
To increase customer satisfaction with our
services through innovation and continuous improvement by proactively engaging
with and listening to our citizens, customers and staff.
·
Using an agile delivery model and adapting to
changing landscapes, be recognised as a leading council, ensuring value for
money and affordability of council services, facilities and assets.
·
To deliver our activities and functions in a
sustainable manner, integrating social, economic and environmental factors when
planning or decision-making, in line with the UN Sustainable Development Goals.
·
To embed our values in our day-to-day working
environment, ensuring our employees feel supported and motivated to achieve
their full potential.
At the end of the year:
·
60% of our measures were achieved or on track.
·
20% were delayed but progressing.
·
20% were not achieved.
Our performance is explained in the pages that follow.
Action 1 |
Ensure we remain responsive to citizen
need by developing processes that allow us to engage with, listen to and act
on feedback from our stakeholders to increase customer satisfaction with our
services. |
Measure 1 |
Establish processes to gauge customer
satisfaction levels by 31 March 2024. |
Status:
Delayed but progressing |
The
Council is developing a Customer First approach and processes to gauge
customer satisfaction will be considered as part of that workstream. To
progress the project, a scoping exercise into the methods currently used across
the Council to measure customer satisfaction has been completed and an
analysis of the findings is underway. This will help to shape the next steps
in the process. Furthermore,
during the completion of the public consultation exercise for the annual
Performance Improvement Plan for 2024/25, respondents were asked an
open-ended question requesting their feedback on areas they felt the Council
could improve on. Of the 216 respondents, 108 provided feedback and the
responses have been analysed and reported to the Senior Management Team, officers
and Elected Members. The
results of the Citizens Survey (2022) will serve as a baseline to track
progress in enhancing customer satisfaction levels as part of this
initiative.
|
Action 2 |
Work collaboratively with our community
planning partners, to consolidate and capitalise on shared resources to
deliver positive outcomes for citizens. |
Measure 1 |
Engage with at least 8 community
partners by 31 March 2024. |
Status:
Achieved |
The
Community Planning process in Mid and East Antrim is dependent on multiple
organisations working together to achieve positive outcomes for the citizens
of the borough. Over the course of the past year, the Council has engaged
with a number of community partners, including but not limited to:
In February
2024, we delivered four thematic workshops, each based on one of the themes
from the Community Plan, these drew representation from over 30 partner
organisations. A Strategic Alliance meeting in March 2024, further confirmed
this achievement, with 13 community planning partners in attendance. |
Measure 2 |
Deliver at least 8 community planning
initiatives by 31 March 2024. |
Status:
Achieved |
We successfully delivered a total of 13
community planning initiatives. These included the Loneliness Network, Autism-Friendly,
Dementia-Friendly, Business Escalator, Place Promotion, Community Fridge,
Sensory Gardens, Ageing Well, Affordable Food Hub, Uniform Exchange,
Volunteering, Support Hub, and Safer Places.
|
Action 3 |
Ensure we promote sustainable
development for the borough across economic, social and environmental
dimensions, through the delivery of the 17 United Nations Sustainable
Development Goals. |
Measure 1 |
Deliver a minimum of 10 programmes
against each of the 17 Goals by 31 March 2024. |
Status:
Achieved |
The Council
continues to deliver programmes against each of the 17 United Nations
Sustainable Development Goals. Every two years, we host an MSc Leadership in
Sustainability student to conduct a study and produce a report on the Council's
progress on delivery against each goal. The most recent report was published
in September 2023 and noted that the Council was delivering towards 94 of the
applicable 114 targets, and 120 of the applicable 168 indicators. |
Action 4 |
Contribute to a healthy economy by
delivering effective and efficient services for the benefit of citizens and
businesses across the borough. |
Measure 1 |
Ensure that at least 53% of payments to
suppliers are made within 10 working days by 31 March 2024. |
Status:
Achieved |
Between April 2023 and March 2024, 65% of
payments to suppliers were made within 10 working days. |
Measure 2 |
Ensure that at least 85% of payments to
suppliers are made within 30 calendar days by 31 March 2024. |
Status:
Target
not achieved |
Due to a variety of internal factors we
failed to achieve this target, with 81% of payments to suppliers made within
30 calendar days. |
Measure 3 |
Processing time for major planning
applications within an average of 30 weeks by 31 March 2024. |
Status:
Target
not achieved |
From April 2023 to March 2024, the
average time for the processing of major planning applications was 67.4
weeks, up from 47.6 weeks in 2022/23. This increase was primarily due to the
prolonged review of an unusually complex application. The average processing time across all
Northern Ireland councils was 46.5 weeks. Only 3 councils met the 30-week
target, with Mid and East Antrim ranking ninth position. |
Measure 4 |
Processing time for local planning
applications within an average of 15 weeks by 31 March 2024. |
Status: Achieved
|
From April 2023 to March 2024, the
average time for the processing of local planning applications was 9.4 weeks,
up from 8.6 weeks in 2022/23. The average processing time across all
Northern Ireland councils was 20.8 weeks. Only 3 councils met the 15-week
target, with Mid and East Antrim Borough Council achieving the shortest
average processing time in 2023/24. |
Measure 5 |
70% of enforcement cases concluded
within 39 weeks of receipt of complaint by 31 March 2024. |
Status:
Achieved |
From
April 2023 to March 2024, 87.3% of enforcement cases were concluded within 39
weeks, down from 89.5% in 2022/23. The
average across all Northern Ireland councils was 76.4% in 2023/24, up from
74.2% in 2022/23, with 7 councils meeting the target last year. Mid and East
Antrim Borough Council ranked third position. |
Action 5 |
Ensure we remain responsive to employee
needs by engaging, listening to and acting on feedback from our employees to
increase staff satisfaction levels. |
Measure 1 |
Develop an action plan based on the
results of the Listening to Staff survey by 31 March 2024. |
Status:
Delayed but progressing |
The
Listening to Staff survey was completed, with findings analysed and shared
with officers. Working groups were established to further investigate and
identify the next steps. A draft Action Plan has been developed and is
currently awaiting review and approval. |
Strategic Theme 6: Our
Environment
Our strategic objectives were:
·
To deliver the Local Development Plan in line
with the Council’s climate and sustainability commitments.
·
To empower, educate and work in partnership
with our citizens and local businesses to progress towards net zero carbon
emissions by 2050.
·
To support local communities to create an
environmentally resilient and sustainable borough.
·
Invest to improve and develop our parks, open
spaces and built heritage, ensuring they meet the needs of citizens and
visitors, and promote the considerate use of all spaces.
·
To lead by example and reduce the impact of the
Council’s services, to improve and sustainably manage our environment,
protecting it for future generations.
At the end of the year:
·
91% of our measures were achieved or on track.
·
9% were delayed but progressing.
Our performance is explained in the pages that follow.
Action 1 |
Utilise nature-based solutions to aid
climate change adaptation and improve the health and wellbeing of our
citizens across the borough. |
Measure 1 |
Deliver at least 3 nature-based
solution projects by 31 March 2024. |
Status:
Achieved |
Across
the year, 3 major projects were delivered, as follows: ·
Ahoghill Natural Park – which included
the development of wet woodland to create habitat and enhance water
retention. ·
ECOS Conservation Grazing – to develop
appropriate management of the floodplain. ·
Ballymena Urban Forest - which included planting
to create habitat and alleviate flooding. A
Conservation Grazing plan and two Ancient Woodland Management plans have also
been developed, with implementation scheduled for 2024/25. |
Action 2 |
Develop a Tree and Woodland Management Strategy
to enhance biodiversity, increase carbon store and support ecosystems across
the borough. |
Measure 1 |
Plant at least 2,000 trees on Council
land by 31 March 2024. |
Status:
Achieved |
Approximately 2,000 trees were planted
on Council-owned land. |
Measure 2 |
Plant at least 3,000 trees on public
land through Council support by 31 March 2024. |
Status:
Achieved |
The
Council supported the planting of approximately 58,000 trees on public land. |
Action 3 |
Support communities, farmers and local
businesses to be more sustainable, reduce carbon emissions and adapt to a
changing climate. |
Measure 1 |
Work in partnership with Sustainable NI
to promote sustainable practices by 31 March 2024. |
Status:
Achieved |
Our officers have worked in partnership
with Sustainable NI to promote sustainable practices across our service
delivery and with our local communities, and attended regular Sustainable
Development Forum meetings. Our Environmental Education Officer continues to
meet Economic Development Officers to review and update on net zero delivery
with our business sector, including the Agri-sector. |
Measure 2 |
Recruit a Net Zero Officer to deliver
the Mid and East Antrim Net Zero Business (MEANZ Business) project by 30
September 2023. |
Status:
Achieved |
Following the receipt of funding from
Innovate UK Knowledge Transfer Network, we successfully recruited a Net Zero
Innovation and Delivery Manager in July 2023. This officer is working
alongside Innovate UK, under the Fast Followers Programme, to develop and
deliver net zero activities to businesses across the borough. |
Measure 3 |
Engage with at least 40 businesses to
promote net zero activities by 31 March 2024. |
Status:
Achieved |
Between
April 2023 and March 2024, we engaged with 40 businesses to promote net zero
activities. |
Action 4 |
Improve the resource and energy
efficiency of our buildings and practices by first establishing baseline data
of Council emissions, with the goal to reduce costs and our operational
emissions to net zero by 2040. |
Measure 1 |
Establish baseline emissions for
Council buildings with a focus on those with larger consumption rates by 31
March 2024. |
Status:
Achieved |
Baseline emissions have been
established and recorded. This data will be used to monitor carbon emissions
moving forward. |
Measure 2 |
Support the delivery of Council's Green
Growth Strategy through the completion of 5 Renewable Technology projects by
31 March 2024. |
Status:
Delayed
but progressing |
Significant
progress has been made in enhancing our sustainability efforts through the
installation of solar arrays. Sullatober Household Recycling Centre,
Springwell Street Multi-story Car Park in Ballymena, and Larne Leisure Centre
have all been upgraded with new solar arrays. Enabling
works at Carrickfergus Amphitheatre are underway, with completion targeted
for summer 2024. The
procurement process for solar installations at The Braid and Waveney Road
Household Recycling Centre is ongoing, with completion anticipated by the end
of January 2025. Further
desktop reviews are ongoing to identify other potential sites for solar
installations. Locations under consideration include Carrickfergus Town Hall,
the new development at Carnfunnock Country Park, and
Larne Cemetery. |
Action 5 |
Deliver an effective and efficient
waste service that supports citizens and businesses to reduce waste. |
Measure 1 |
At least 50% of household waste
collected to be sent for recycling by 31 March 2024. |
Status:
Achieved |
From
April 2023 to March 2024, 50.7% of household waste collected was sent for
recycling. This is a reduction on last year’s result of 51.4%, and below the
Northern Ireland 2023/24 council average of 51.6%, with annual rates ranging
from 60.9% to 41.1%. A downward trend has been noted across local councils. |
Measure 2 |
No more than 16,387 tonnes of
biodegradable local authority collected municipal waste to be landfilled by
31 March 2024. |
Status:
Achieved |
From April 2023 to March 2024, the
amount of biodegradable waste collected that was sent to landfill increased
to 15,239 tonnes. This is up 4.7% from the previous year and is the fourth
consecutive rise in the borough since 2019/20. |
Measure 3 |
The amount (tonnage) of Local Authority
collected municipal waste arisings. The Department for Communities requires
that each council sets and monitors its own individual target annually. We
have set a target of no more than 75,797 tonnes by 31 March 2024. |
Status:
Achieved |
From
April 2023 to March 2024, at 74,824 tonnes, there was a modest increase in
the volume of collected municipal waste arisings, representing a 1.9% rise
from the previous year. |
We
actively engage in various benchmarking activities, working groups, and best practice
initiatives each year to enhance our organisational performance.
Benchmarking
is an effective tool for the observation, analysis and reporting of performance
over a period of time. By comparing our performance, we can gain insights into
our strengths and identify areas that require improvement.
The
activities outlined below are integral to our commitment to achieving
operational excellence and delivering high standards of service to our communities.
External Benchmarking
This section summarises our
comparative findings on absenteeism and prompt payment performance. It also provides
an overview of our participation in the Association for Public Service
Excellence Northern Ireland Benchmarking Project.
Absenteeism
In 2023/24, 16.46 days were
lost per full-time equivalent employee, 1.48 days less than 2022/23, but
exceeding our target of 14 days.
Almost 65% of employees
experienced no absence during the year, indicating the high rate primarily
relates to a small number of long-term absences rather than a large number of frequent,
short-term absences. Contributing factors include difficulties accessing
medical consultations and treatments leading to extended periods of absence.
Unfortunately, there has also been a significant increase in the diagnosis of
severe health issues among staff.
In terms of benchmarking with
other councils in Northern Ireland, the latest comparable data is for the
2022/23 financial year. During this period, the average rate of absenteeism across
all councils was 16.70 days. At 17.94 days, we ranked third lowest in terms of
performance, ahead of Armagh City, Banbridge and Craigavon Borough Council at 19.91
days, and Newry, Mourne and Down District Council at 23.26 days.
We are committed to implementing
strategies to reduce levels of absenteeism, and have taken a number of steps,
including:
·
Our Audit and Scrutiny Committee is currently
conducting a review into absenteeism.
·
We delivered a range of health and wellbeing
activities and initiatives across the year, including, Health and Wellbeing
Week, Be Kind to Your Mind, and Stress Awareness and Management.
·
We launched our Listening to Staff Survey in November
2022. The survey, which was supported by Trade Union colleagues and our Senior
Management Team, aimed to give staff a voice, and sought to improve wellbeing, satisfaction
levels, and attendance. Working groups were established to examine the survey results
and to identify the next steps. The process is ongoing.
Absenteeism
across Northern Ireland councils (annual results)
2019/20 12.41 days |
2020/21 7.87 days |
2021/22 14.7 days |
2022/23 15.51 days |
2023/24 Not available |
|
Ards and North Down
Borough Council |
2019/20 14.19 days |
2020/21 10.59 days |
2021/22 14.17 days |
2022/23 15.70 days |
2023/24 Not available |
Armagh City,
Banbridge and Craigavon Borough Council |
2019/20 18.28 days |
2020/21 15.67 days |
2021/22 20.51 days |
2022/23 19.91 days |
2023/24 Not available |
Belfast City Council |
2019/20 13.58 days |
2020/21 10.86 days |
2021/22 16.33 days |
2022/23 17.09 days |
2023/24 Not available |
Causeway Coast and
Glens Borough Council |
2019/20 17.82 days |
2020/21 11.34 days |
2021/22 17.01 days |
2022/23 16.99 days |
2023/24 Not available |
Derry City and
Strabane District Council |
2019/20 14.5 days |
2020/21 10.37 days |
2021/22 16.8 days |
2022/23 16.5 days |
2023/24 Not available |
Fermanagh and Omagh
District Council |
2019/20 13.77 days |
2020/21 9.69 days |
2021/22 13.15 days |
2022/23 11.94 days |
2023/24 Not available |
Lisburn and
Castlereagh City Council |
2019/20 13.8 days |
2020/21 11.5 days |
2021/22 13.6 days |
2022/23 15.8 days |
2023/24 Not available |
Mid and East Antrim
Borough Council |
2019/20 10.64 days |
2020/21 4.68 days |
2021/22 15.21 days |
2022/23 17.94 days |
2023/24 16.46 days |
Mid Ulster District
Council |
2019/20 11.7 days |
2020/21 9.72 days |
2021/22 12.11 days |
2022/23 13.13 days |
2023/24 Not available |
Newry, Mourne and
Down District Council |
2019/20 15.8 days |
2020/21 13.6 days |
2021/22 20.66 days |
2022/23 23.26 days |
2023/24 Not available |
2019/20 |
54% |
2020/21 |
78% |
2021/22 |
72% |
2022/23 |
64% |
2023/24 |
64% |
Prompt Payment Performance
This section analyses how
efficiently we process invoices and pay our suppliers.
During 2023/24, 65% of
invoices were paid within 10 working days, exceeding our target of 53%, but
less than the 74% recorded in 2022/23.
For invoices paid within 30 working
days, we achieved 81% against a target of 85%, compared with 87% in 2022/23.
In relation to the percentage
of invoices paid within 30 days, our performance is notably lower than the
other regional councils. Mid Ulster District Council paid 100% of invoices
within the 30-day target, and both Ards and North Down Borough Council and
Armagh City, Banbridge and Craigavon Borough Council paid 96% of their invoices
within the target timeframe. We also fell short of the regional average of
90.73%.
The reasons why this target has
not been achieved are varied and complex, and we are implementing measures to address
the issues, as follows:
·
We are working to fully integrate and optimise our
new financial management system which was adopted towards the end of 2021.
·
Prompt payment performance has been identified
as a key performance indicator in the delivery of our Corporate Plan 2024-2028.
·
To avoid payment delays, a mandatory indicator
has been included in each service area’s business plan for 2024/25, ensuring
purchase orders are receipted in a timely manner after goods or services are received.
Prompt payment performance -
Mid and East Antrim Borough Council (annual results)
Invoices paid within
10 days |
||||
2019/20 50% |
2020/21 57% |
2021/22 68% |
2022/23 74% |
2023/24 65% |
Invoices paid within
30 days (but more than 10
days) |
||||
2019/20 36% |
2020/21 27% |
2021/22 27% |
2022/23 13% |
2023/24 16% |
Invoices paid
outside 30 days |
||||
2019/20 14% |
2020/21 16% |
2021/22 5% |
2022/23 13% |
2023/24 19% |
(Source: Unaudited data from the Department for Communities
quarterly publications).
The percentage of payments made within 30 days - By
Northern Ireland council (annual results)
Antrim
and Newtownabbey Borough Council |
2019/20 86% |
2020/21 89% |
2021/22 80% |
2022/23 80% |
2023/24 84% |
Ards
and North Down Borough Council |
2019/20 93% |
2020/21 96% |
2021/22 98% |
2022/23 97% |
2023/24 96% |
Armagh
City, Banbridge and Craigavon Borough Council |
2019/20 67% |
2020/21 91% |
2021/22 95% |
2022/23 95% |
2023/24 96% |
Belfast
City Council |
2019/20 93% |
2020/21 93% |
2021/22 94% |
2022/23 92% |
2023/24 93% |
Causeway
Coast and Glens Borough Council |
2019/20 79% |
2020/21 87% |
2021/22 92% |
2022/23 91% |
2023/24 87% |
Derry
City and Strabane District Council |
2019/20 81% |
2020/21 79% |
2021/22 65% |
2022/23 74% |
2023/24 82% |
Fermanagh
and Omagh District Council |
2019/20 94% |
2020/21 94% |
2021/22 94% |
2022/23 96% |
2023/24 95% |
Lisburn
and Castlereagh City Council |
2019/20 91% |
2020/21 87% |
2021/22 91% |
2022/23 87% |
2023/24 89% |
Mid and
East Antrim Borough Council |
2019/20 86% |
2020/21 84% |
2021/22 95% |
2022/23 87% |
2023/24 81% |
Mid
Ulster District Council |
2019/20 94% |
2020/21 95% |
2021/22 99% |
2022/23 99% |
2023/24 100% |
Newry,
Mourne and Down District Council |
2019/20 90% |
2020/21 86% |
2021/22 89% |
2022/23 86% |
2023/24 95% |
The Association of Public Service Excellence
We have participated in the
Association for Public Service Excellence Benchmarking Project since 2015/16.
This initiative gathers and compares data from participating councils across the
region each year for the following service areas:
·
Arts and Heritage
·
Building Control
·
Cemetery and Crematorium Services
·
Community Development
·
Corporate Services (Organisational Design and
Human Resources, ICT, Registration Services, Training and Learning, Finance and
Financial Services, Legal Services, Democratic Services, Complaints, and the Cost
of Services)
·
Economic Development
·
Environmental Health
·
Parks, Open Spaces and Horticultural Services
·
Planning
·
Refuse Collection
·
Street Cleansing
·
Sports and Leisure
2022/23 results
The most recently available
comparable data is for the 2022/23 financial year, for which we submitted data for
132 indicators, 115 of which were comparable. Of the comparable indicators:
The findings from the survey
were shared with each department, and influenced the development of business
plans for 2024/25.
Best Practice
We actively participate in
best practice learning each year. By doing so, we hope to enhance our own service
delivery and ensure the best outcomes for our borough.
A comprehensive list of best practice initiatives undertaken in 2023/24 can
be found in Appendix 4.
Internal Benchmarking
We also conduct extensive
internal benchmarking, as part of our performance improvement arrangements.
This process is facilitated
through the inclusion and monitoring of performance indicators within our
Corporate Plan and annual departmental business plans.
By regularly analysing and
comparing these indicators, we can identify successes, address challenges, and
implement effective strategies to demonstrate continuous improvement. We have
provided some examples of this below.
Number
of health and safety accidents recorded (annual results)
2019/20 |
49 |
2020/21 |
14 |
2021/22 |
19 |
2022/23 |
11 |
2023/24 |
10 |
Over
the last five years, the number of health and safety accidents recorded has
decreased significantly, from 49 in 2019/20 to 10 in 2023/24.
Number
of training days per full-time equivalent employee (annual results)
2021/22 |
1.36
days |
2022/23 |
3.5
days |
2023/24 |
3.46
days |
We have
demonstrated a consistent focus on enhancing skills and knowledge across the
workforce, ensuring our teams are well-equipped to meet evolving challenges,
and to deliver high-quality services.
Figures
are only available from 2021/22 onwards, as the total spend on training per full-time
equivalent employee was measured previously.
Number
of visitors to strategic tourist attractions (annual results)
2019/20 |
92,026 |
2020/21 |
5,016 |
2021/22 |
39,055 |
2022/23 |
86,432 |
2023/24 |
98,455 |
There
was a dramatic reduction in the number of visitors to our strategic tourist
attractions in 2020/21, a direct result of the COVID-19 pandemic and subsequent
lockdown. Since 2021/22 visitor numbers have shown a positive recovery, with
2023/24 exceeding pre-pandemic levels.
Number
of attendees at Council-led events (annual results)
2019/20 |
38,050 |
2020/21 |
9,100 |
2021/22 |
29,060 |
2022/23 |
29,800 |
2023/24 |
42,830 |
Once again,
the COVID-19 pandemic was an impacting factor on the number of events and
attendees in 2020/21. Attendance figures have since rebounded, showing steady
year on year growth, with a 43% increase in the number of attendees from 2022/23
to 2023/24.
Keep Northern Ireland Beautiful Street
Cleanliness LEAMS score (annual results)
2019/20 |
72% |
2020/21 |
69% |
2021/22 |
76% |
2022/23 |
72% |
2023/24 |
70% |
A LEAMS scores takes account
of how clean or littered an area is. A score closer to 100 indicates better
performance, and 66 is the point at which performance is considered acceptable.
Looking Forward
As we look to the future, we
have developed plans that reflect what you, the people of Mid and East Antrim,
have told us you want, and which aim to deliver for the borough in a time of
both significant opportunity and considerable challenge.
Our plans will help us ensure
that we use our resources wisely, so we can provide first-class, value for
money services, at an affordable cost.
Right now, we are taking a closer
look at what we do and how we do it, and are looking internally and externally
to identify ways to improve our services, support economic prosperity, develop
safe and inclusive communities, and to protect and enhance our environment.
Corporate Plan 2024-2028
Our vision is that Mid and
East Antrim will be a strong, vibrant, safe and inclusive community, where
people work together to improve the quality of life for all, the same vision as
the borough’s Community Plan.
This ambition cannot be met by
any singular organisation alone, and can only be achieved by working in strong
partnership with other organisations across the region.
Our plan will be delivered under
the four key pillars of People, Place, Planet and Performance.
To find out more, please visit:
www.midandeastantrim.gov.uk/corporateplan
Performance Improvement Plan 2024/25
Our new Improvement Plan aims
to improve the quality of life and environment for our ratepayers and
communities through three Improvement Objectives, which were agreed by the Full
Council on 13 May 2024.
A summary of the plan can be
found on the following pages.
To view the full plan, and the
outcomes for our citizens, businesses and communities, please visit: www.midandeastantrmi.gov.uk/performance
Improvement Objective 1
People: We will work with
partners to improve the lives of citizens.
·
The actions set out to achieve this objective
align with the priorities identified through public consultation. They support
priority groups and provide opportunities for skills development and employment
progression. They offer health and wellbeing support, and help to improve
equality of opportunity, accessibility, and inclusivity.
·
Developing skills and job prospects, and
support to reduce poverty, were two of citizens’ top five priorities for making
the borough a better place to live in. Only 28% agreed the area is a good place
for job opportunities (MEABC Citizens Survey 2022).
·
With the rising cost of living and the impact
of the pandemic, the number of financially insecure households is increasing.
Anecdotal evidence indicates that poverty is impacting families across the
whole borough. Our Citizens Survey (2022) found on a scale of 1 to 10, with 1
being not at all satisfied, half of respondents rated their satisfaction with their
financial health as being 5 or less.
·
This objective aligns with the Department for
the Economy’s vision for Northern Ireland of creating jobs, increasing incomes,
improving productivity, and providing opportunities for all.
·
In terms of wellbeing, almost 50% of residents
said they want to see more support services for children and families, and/or
people with disabilities (MEABC Citizens Survey 2022).
·
The issue of inclusion was highlighted during
the review of the Community Plan (2022), particularly for people with
disabilities and learning difficulties. People from ethnic minority
backgrounds, young people, and older people were also identified as being ‘at
risk’.
Improvement Objective 2
Place: We will maintain and
improve our local areas.
·
The actions set out to achieve this objective
align with the key priorities identified through public consultation.
Improvements to playparks and provision for outdoor recreation (particularly
for young people) was a high priority for citizens. Actions will also support,
improve, and revitalise the borough’s town centres.
·
Supporting
and developing activities for children and young people, delivering clean and
attractive streets and towns, and supporting our parks, green spaces and the
natural and built environment, were within citizens’ top five priorities for
making the area a better place to live in (MEABC Citizens Survey 2022).
·
More
than a third of citizens would like to see more access to green spaces, such as
parks and forests (MEABC Citizens Survey 2022).
·
Community
tourism can help boost local economies by encouraging visitor footfall, increasing jobs, and generating
revenue for local businesses. This can help increase civic pride in a local
area and develop more sustainable and prosperous communities.
Improvement Objective 3
Planet: We will reduce our
environmental impact and improve sustainability.
·
The
actions set out to achieve this objective align with the key priorities identified
through public consultation. They demonstrate how the Council is leading by
example, whilst also working to engage and educate on sustainability. They
assist the development of the borough’s electric vehicle charging network, they
focus on providing an effective and efficient waste management service, and
they demonstrate support for the biodiversity within the borough.
·
Our
citizens identified help to reduce consumption, waste and litter, and awareness
and assistance in tackling climate change as the two most important things the
Council could do to be more environmentally friendly. Adopting environmentally
sustainable transport ranked third and protecting plants and animals ranked
fourth (MEABC Citizens Survey 2022).
·
Measures
to address climate change, environmental awareness, and the importance of
respect for the local and natural environment, were points raised throughout
the Community Planning Review (2022) consultation.
·
The
phase out date for the sale of new petrol and diesel cars is 2035.
Assessment of Performance
This assessment looks at our
performance in discharging our Duty to make arrangements
to secure continuous improvement, as defined under the Local Government Act
(NI) 2014.
It looks at our arrangements
to secure continuous improvement, our performance in meeting our Improvement
Objectives, statutory and self-imposed indicators and standards, compared with
our performance in previous financial years, and with that, and the previous financial
years of other councils.
Based on the evidence
collected, we have identified how we can improve our performance, and the steps
we will take to do so.
Performance
in discharging our duty to make arrangements to secure continuous improvement in the
exercise of our functions
Each
year a council must set Improvement Objectives, and
have appropriate arrangements in place to achieve them. The objectives must be
framed to bring about improvement in at least one of the seven aspects of
improvement outlined within the Act, of strategic effectiveness, service quality,
service availability, fairness, sustainability, efficiency, and innovation.
A
council must also publish an assessment of its performance in meeting statutory
or self-imposed indicators, within a financial year and previous financial
years, and with those of other councils, where practicable.
Our
arrangements to secure continuous improvement are outlined within our
Performance Management Framework. This framework drives performance at all
levels within the organisation, by aligning the Community Plan for the borough
with our four-year Corporate Plan, annual Performance Improvement Plan,
departmental business plans, and each individual employee’s work plan. This
helps to ensure better longer-term outcomes for citizens.
Each
of these plans have clearly defined measures, which enable performance to be
monitored, and areas for improvement to be identified. These arrangements are
supported by a dedicated performance management system.
Our
priorities for improvement are based on a thorough, evidence-based
understanding of the communities we serve, local needs, and an assessment of
our capacity to meet those needs.
Our
development approach includes a review of legislation and guidance, critical
self-analysis, alignment with wider regional strategies and policies, analysis
of our environment and regional statistics, consultation and engagement with
stakeholders, the results of our Citizens Survey (2022), staff experience and
expertise, and the appropriate screening of our improvement plans and
strategies.
We
also welcome feedback, input, and suggestions for improvement from the public
at any time throughout the year through our Public Questions facility and
through direct contact with our Performance and Improvement Team.
Oversight
of our performance improvement responsibilities sits within the remit of a
dedicated committee, tasked with reviewing performance, making recommendations
for course corrections, and considering opportunities for innovation and best
practice to ensure continuous improvement and quality service delivery.
Regular
monitoring and reporting arrangements are in place to ensure progress,
accountability, and transparency.
Updates
on our Corporate Plan and Performance Improvement Plans are published on our website, and promoted on our social media channels.
Our
arrangements to secure continuous improvement were audited by the Northern
Ireland Audit Office in 2023/24.
The
auditor found that the Council had discharged its duties in connection with (1)
improvement planning and (2) publication of improvement information in
connection with section 92 of the Act, and had acted
in accordance with the Department for Communities’ guidance sufficiently.
As a
result of an improvement assessment, the auditor believed that the Council had
discharged it duties under Part 12 of the Act, and had
acted in accordance with the Department for Communities’ guidance sufficiently.
In their opinion the Council had demonstrated a track record of ongoing
improvement, and the Council was likely to comply with Part 12 of the Act in
2023/24.
No
recommendations or proposals for improvement were made as a
result of the audit. Two proposals for improvement remain ongoing from
previous years.
Proposal
1 states that the Council should prioritise prior year proposals for
improvement and take steps to address them.
Proposal
2 states that the Council should continue to work with other councils and the
Department for Communities to agree a suite of self-imposed indicators and
standards that would allow for meaningful comparisons to be made and published.
Area
for improvement
While
the implementation of Proposal 1 and Proposal 2 are outside the direct control
of Mid and East Antrim Borough Council, the agreement of self-imposed
indicators and standards to allow for meaningful comparisons to be made with
other councils remains an area for improvement.
To
progress this action, we will continue to participate in meetings of the Local
Government Performance Improvement Working Group, established to support the
development of a consistent approach to performance improvement, and consisting
of the Department for Communities, the Northern Ireland Audit Office, and each
of Northern Ireland’s 11 councils.
Performance
in meeting Improvement Objectives
The
plan aligned with the long-term vision for the borough, as outlined in the
Community Plan and Corporate Plan, was based on extensive research and
stakeholder engagement, and made a demonstrable contribution to the aspects of improvement
described within the Act.
The
plan set out the visible improvements that citizens could expect to see
(outcomes), it had defined terms of success with established links to service
programmes and budgets, and was capable of being
supported by objective evidence (measures).
The
plan focused on enhancing our citizens’ health and wellbeing, improving
employment outcomes, supporting business start-up and growth, regenerating our
town centres, enhancing broadband service provision, and supporting the
development of the electric vehicle charging network.
Of our
33 measures, at the end of the year, 61% were achieved or on track, 36% were
delayed but progressing, and 3% were not achieved.
At the
end of the year, only one measure was not achieved. This relates to the
statutory 30-week standard for the average processing time of major planning
applications. This key performance indicator is discussed in detail further within
the assessment.
Area
for improvement:
At the
end of the year, almost a third of measures were marked as delayed but
progressing. These measures have been included within the Performance
Improvement Plan for 2024/25 to ensure ongoing accountability and
prioritisation.
Performance
in meeting statutory indicators and standards
The
statutory performance indicators and standards, set by the Department for
Communities in the areas of Economic Development, Planning, and Waste
Management, are included within our annual business plans, and where possible,
within our Improvement Objectives.
Of the
7 indicators and standards, Mid and East Antrim Borough Council achieved 6 in
2023/24.
Indicator:
The number of jobs promoted through business start interventions.
In
2023/24, 103 jobs were promoted through business start interventions, 21% over
the target of 85. Of these, 66 were through the Go for It programme and 37
through Go Succeed, which launched in November 2023.
As
monthly performance data remains subject to verification, it is not yet
available for publication or for cross-council comparison. While early results
are promising, a clear and complete understanding of the impact and performance
of Go Succeed will only be available when the initial evaluation period
concludes, and data is fully verified.
Indicator:
The average processing time of major planning applications.
Councils
are not fully responsible for the full range of duties required to process
major planning applications. These applications comprise of significant
development projects, which generally require assessments by statutory and
other bodies, and are subject to extensive scrutiny and consultation.
In
2023/24, the average processing time of major planning applications in Mid and
East Antrim Borough Council was 67.4 weeks, well above both the 30-week
statutory standard, and the Northern Ireland 11 council average of 46.5 weeks.
This is our second consecutive annual rise, with the recent increase attributed
to an unusually complex application, which is now processed.
While
significant improvements were made within some council areas in 2023/24, the
average processing time among the councils ranged from 21.1 weeks to 154.8
weeks. Mid and East Antrim Borough Council held ninth council position in
2023/24.
Achieving
the 30-week standard has been a challenge over the last five years and we have
made representations to the Department of Infrastructure to share our concerns.
As we
move into 2024/25, 8 applications are yet to be decided, 6 of these are from the
2023/24 financial year, and 2 from 2022/23. Of these, 4 remain under review by
various consultees and cannot advance until all feedback or decisions are
received.
Area
for improvement:
The
Council will continue to progress major planning applications, with a view to minimising
processing times within our areas of control.
We are
open to collaborating with the Department for Infrastructure and other
stakeholders on alternative measures that would improve the effectiveness and
efficiency of the process, and to allow for a fairer and more accurate metric
for measuring success.
Indicator:
The average processing time of local planning applications.
In
2023/24, the average processing time of local planning applications in Mid and
East Antrim Borough Council was 9.4 weeks, significantly lower than the 15-week
statutory standard, and well above the Northern Ireland 11 council average of
20.8 weeks. Three councils were within the target, with Mid and East Antrim
Borough Council in top council position for the fifth consecutive year.
Indicator: The percentage of enforcement cases
concluded within 39 weeks.
In 2023/24, 87.3% of enforcement cases
were concluded within 39 weeks in Mid and East Antrim Borough Council. While
slightly lower than our 2022/23 performance at 89.5%, this result is
significantly higher than the 70% minimum standard, and well above the Northern
Ireland 11 council average of 74.2%. We ranked third council position in
2023/24.
Indicator:
The percentage of household waste collected by the council that is sent for
recycling.
We
have collected more than the 50% minimum standard every year since 2017/18. At
50.7%, rates were lower in 2023/24 than in the previous two years. While a
downward trend has been noted across Northern Ireland’s councils, 7 councils
met the target in 2023/24, with Mid and East Antrim Borough Council positioning
sixth.
Many
factors outside of the Council’s control can adversely impact recycling levels.
We have, and will continue to take steps to positively influence recycling
practices within the borough and the wider region.
Area
for Improvement:
We
will continue to undertake measures to positively influence recycling
practices.
We
will continue to work with the regional Waste Resources Action Programme (WRAP)
to co-design and promote waste and recycling campaigns.
We
will continue to support the Eco-Schools Programme, as included in our
Performance Improvement Plan for 2024/25.
We
will continue to deliver community engagement sessions on waste and recycling,
as included in our Performance Improvement Plan for 2024/25.
Our
Waste Harmonisation Sub-Committee will continue to explore ways to deliver a
more effective and efficient waste management system, and
increase recycling performance.
We
will also continue to engage with our stakeholders to increase household and
non-municipal household recycling, such as the Department for Agriculture,
Environment and Rural Affairs.
Indicator:
The amount of biodegradable local authority collected municipal waste that is
landfilled.
In
2023/24, the amount of biodegradable waste collected that was sent to landfill
increased to 15,239 tonnes, up 4.7% on 2022/34, and the fourth consecutive rise
in the borough since 2019/20. The amount recorded is lower than the allowance
set by the Northern Ireland Landfill Allowance Scheme, which was in place until
2019/20, and continues to be used as an internal target, pending clarity moving
forward.
Area
for improvement:
We
will continue to deliver practices to address the increasing amount of
biodegradable waste sent to landfill, such as, organic and dry recycling
kerbside collections, textile and wood disposal services, and various
communications campaigns delivered throughout the year.
Indicator:
The amount of local authority collected municipal waste arisings.
There
was a modest increase in the volume of municipal waste arisings in the borough
in 2023/24, to 74,842 tonnes. No statutory standard is set for this indicator
as we are obligated to collect the amount of recyclable and non-recyclable
waste presented at the kerbside, household recycling centres, and commercial
waste.
Area
for improvement:
We
will continue to work towards positively influencing the amount of waste
arisings in the borough.
Our
ongoing commitment to positive environmental practices is demonstrated in our
Corporate Plan for 2024-2028, and our Climate and Sustainability Action Plan
for 2023-2027.
We
also aim to deliver 5 circular economy initiatives as part of our Performance
Improvement Plan for 2024/25.
Performance
in meeting self-imposed indicators and standards
Self-imposed indicators and
standards are how we, as a Council, have decided to measure our performance.
These indicators relate to our Corporate Plan (at strategic level), and annual
business plans (at operational level).
Our Corporate Plan for 2024-2028
was adopted in May 2024. It is based on a body of evidence which helps to identify
our medium-term priorities. To ensure the plan’s delivery, its objectives guide
our annual business planning process.
An interim plan was adopted
for the 2023/24 financial year. Our success in delivering this plan is
summarised in detail within the main body of this report. On a quantitative
basis, at the end of the year, of 61 performance measures, 75% were either
achieved or on track, 12% were delayed but progressing and 13% were not
achieved.
Of the 8 measures that were
not achieved, 3 relate to targets under the Good Relations Programme, which due
to a reduced funding allocation, could not be achieved.
There were 2 other measures
adversely affected by resource and funding constraints; the development of 5 new
tourism products, which we continue to explore funding opportunities for, and
the delivery of 27 programmes through the Loneliness Network against a target
of 40.
The other 3 measures that were
not achieved in 2023/24 were; absenteeism targets,
prompt payment targets, and the processing time of major planning applications.
The planning target was discussed in detail earlier in the assessment, and the
two other measures are discussed below.
Of the 7 measures identified
as delayed but progressing, 4 will progress as part of the Performance
Improvement Plan for 2024/25; the Carrickfergus
Townscape Heritage Initiative, the MEAqua Strategy and Action Plan, the MEA
Age-Friendly Strategy and Action Plan, and the delivery of renewable technology
projects.
The measure relating to the i4C
and the CleanTech Centre will progress as part of the Belfast Region City Deal.
The measure relating to the gauging of customer satisfaction levels will
progress as part of the Corporate Services Directorate restructure.
The final measure relates to
the development of an action plan based on the results of our Listening to
Staff Survey. A draft plan has been developed and is awaiting review and
approval.
Area for improvement:
The Council will continue to
progress the completion of all 7 Corporate Plan indicators classed as delayed
but progressing within 2024/25.
Additional benchmarking performance
We actively engage in various
benchmarking activities, working groups, and best practice initiatives to
enhance our operational performance each year.
Externally, we benchmark our
performance against other councils in Northern Ireland for absenteeism levels
and prompt payments, and we participate in the Association for Public Service
Excellence Northern Ireland Benchmarking Project.
For absenteeism, 16.46 days
were lost per full-time equivalent employee in 2023/24 within Mid and East
Antrim Borough Council, a reduction on 2022/23 of 1.48 days, but in excess of our target of 14 days. With almost 65% of
employees experiencing no absence during the year, data suggests, the high rate
primarily rates to a small number of long-term absences. Contributing factors
relate to difficulties accessing medical consultations and treatments leading
to extended periods of absence, and an unfortunate increase in the diagnosis of
severe health conditions.
In comparison with other
councils in Northern Ireland, the latest available data is for the 2022/23
financial year, where an average of 16.7 days was recorded. During this period,
we positioned third lowest for performance, at 17.94 days.
We have implemented a number of steps to positively impact levels of absenteeism
within the organisation, including the delivery of health and wellbeing
initiatives, the launch of our Listening to Staff Survey, and our Audit and
Scrutiny Committee is currently conducting a review into absenteeism.
Area for improvement:
The implementation of
strategies to positively impact absenteeism levels remains a key priority for
the Council. We will continue to progress the action plan resulting from the
Listening to Staff Survey and review into absenteeism.
We also monitor and compare
our prompt payment performance, in other words, how efficiently we pay our
suppliers. In 2023/24, 65% of invoices were paid within 10 working days,
exceeding the target of 53%, but a reduction in performance from 2022/23, at
74%.
For invoices paid within 30
working days, a result of 81% was recorded against a target of 85%, a reduction
in performance from 2022/23, at 87%. This performance is notably lower than
other councils in Northern Ireland, with a regional average of 90.73%.
Area for Improvement:
A
number of actions are being taken to address the complex
issues affecting prompt payment performance, including, working to fully
integrate and optimise our financial management system, monitoring payment
processing performance as part of our Corporate Plan, and including a mandatory
indicator in all departmental business plans to ensure purchase orders are
receipted in a timely manner after goods and services are received.
As part of the Association for
Public Service Excellence (APSE) Northern Ireland Benchmarking Project, we are able to compare data with other participating regional
councils for 12 service areas. In 2022/23, we submitted data for 132 indicators,
115 of which were comparable. We achieved top position in 10%, lowest in 17%,
performed better than the regional average in 41%, and below the regional
average in 32% of comparable indicators.
Area for Improvement:
The results of the APSE analysis have been shared with each relevant department, and influenced the development of business plans
for 2024/25.
We also conduct extensive
internal benchmarking, facilitated through the inclusion and monitoring of
performance indicators within our Corporate Plan and annual business plans. By regularly
analysing and comparing our data, we are able to identify
our successes, address challenges, and implement effective strategies for
course correction where necessary.
A wide range of best practice
learning each year helps to enhance our service delivery and ensure the best
outcomes for our borough.
Get Involved
It is really important that
Mid and East Antrim citizens’ voices are heard, and that they have the
opportunity to play their part in shaping local democracy.
We want your input, views and
feedback as we continue our transformation, and as we work to deliver the very
best public services, including waste collections, recycling, leisure services,
business support, parks, funding, economic development, health and wellbeing,
and much more.
We are committed to
championing openness and transparency, and invite members of the public who
live, work or study in the borough to put their questions directly to Elected
Members and officers.
To submit a question to the
Council, please complete the short form at: https://www.midandeastantrim.gov.uk/council/council-and-committee-meetings/public-questions-to-council
Suggestions and comments on
areas where we can enhance our services can also be submitted directly to the
Performance and Improvement Team at any time throughout the year, via any of
the following methods:
By email: performance@midandeastantrim.gov.uk
By telephone: 0300 1245 000
By post: Corporate
Performance and Improvement Team
Mid
and East Antrim Borough Council
1-29
Bridge Street
Ballymena
BT43
5EJ
Closing Remarks
As a Council, we have worked
vigorously to embed a culture of continuous improvement, and reflecting on the
past year, I am highly impressed with our collective achievements.
Despite a challenging
environment, and resource constraints, the work completed has significantly
enhanced the experiences and opportunities of citizens, communities,
businesses, and visitors across the borough.
As the transformation of Mid
and East Antrim Borough Council continues, we are working hard to align our
operations with the challenges we face, and remain committed to working with
our communities to make sure that we understand local needs, and that we make
the best use of our resources to meet them. This report has identified some
areas for improvement, which we will prioritise for progression in the year
ahead.
Looking to the future, our newly
launched Corporate Plan and Performance Improvement Plan, demonstrate our
ongoing commitment to improving the quality of life for all. I warmly encourage
you to follow our journey via our social media channels, which offer a window
into the transformative work we are carrying out across the borough.
I want to thank our
communities, Elected Members, partners, and indeed our staff for their hard
work and support throughout the year, and I look forward to the year ahead.
Valerie Watts
Interim Chief Executive
Appendix 1: Audit
The Local Government Auditor,
as part of their annual Audit and Assessment, can make recommendations that the
Council should take in order to comply with the requirements of the Local
Government Act (2014) NI (Part 12).
The auditor can also make proposals
for improvement, which represent good practice, and should assist the Council
in meeting its performance improvement responsibilities.
All audit related matters sit within
the remit of the Corporate Resources, Policy and Governance Committee,
including the monitoring of actions emanating from performance audits.
Within Mid and East Antrim
Borough Council, all prior proposals for improvement have been addressed, with
the exception of two.
An update on the outstanding proposals for improvement is
provided below.
Proposal 1 |
The Council should prioritise prior year proposals for
improvement and take steps to address them. |
Status: In progress |
One prior year proposal remains in
progress (see Proposal 2). |
Proposal 2 |
The Council should continue working with other
councils and the Department to agree a suite of self-imposed indicators and standards.
This will enable meaningful comparisons to be made and published in line with
its statutory responsibility. |
Status: In progress |
Mid and East Antrim Borough Council is a
member of the Local Government Performance Improvement Working Group, which was
established to support the development of a consistent approach to
performance improvement. Membership of the group includes the Department
for Communities, the Northern Ireland Audit Office, and Performance Officers
from each of the 11 regional councils. The group acts as a forum to share
knowledge, information, and good practice, and have identified a need to
clarify benchmarking requirements. The Department for Communities have
communicated that there will be a wider review of the Local Government Act (NI)
2014, and have committed to work with local councils as part of this process. The longer-term approach to benchmarking
will remain a focus and will continue to be developed. |
Appendix 2: Internal
Benchmarking
·
BuySupplyNI
monitoring and tracking
·
Capital
Plan monitoring and reporting
·
Equality
Action Plan and Disability Action Plan monitoring and reporting
Appendix 3: External
Benchmarking
Appendix 4: Benchmarking and
Best Practice Case Studies
Timeframe |
Council Department |
Purpose |
Outcome |
|
Live Here Love Here Steering Group |
June 2023 November 2023 |
|
|
|
Association
for Public Service Excellence Energy Webinar |
September
2023 |
|
|
|
Climate
Essentials Net Zero Webinar |
September
2023 |
|
|
|
Sustainable
NI Workshop |
November
2023 |
|
|
|
UK Scope 3 Green House Gas Emission
Reporting Webinar - Business in the Community |
December 2023 |
|
|
|
Sustainable Development Forum Meeting -
Sustainable NI |
September 2023 |
|
|
|
EPUK
Investments Ltd - Energetický a průmyslový Holding (EPH) |
January
2024 |
|
|
|
Waste Electrical and Electronic
Equipment Consultation Workshop - The Local Authority Recycling Advisory
Committee |
January 2024 |
|
|
|
NI National Communications Advisory
Panel Meeting |
January 2024 |
|
|
|
Re-use in council webinar - NI Resource
Network |
March 2024 |
|
|
|
Net Zero Delivery - Mid and East Antrim
Borough Council |
Monthly |
|
|
|
All-Party Group on Climate Change – NI
Executive |
Every 2 months |
|
|
|
Northern Ireland Public Sector
Communications Forum |
Ongoing |
|
|
|
Northern Ireland Local Government
Association Communications meetings |
Ongoing |
|
|
|
Launch of Empower UK |
May 2023 |
|
|
|
Inter Trade Ireland Business Summit |
June 2023 |
|
·
Cross-border trade
development. |
|
Northern Ireland Explore Enterprise
Support Service Launch |
June 2023 |
|
|
|
Community Wealth Building Symposium |
June 2023 |
|
|
|
NI Global Entrepreneurship Monitor
Report 2022/23 |
June 2023 |
|
|
|
Engage in Inclusivity Workshop |
July 2023 |
|
|
|
NI Ethnic Minority and Migrant
Entrepreneurs Position Paper 2023 |
August 2023 |
|
|
|
Innovation Lab |
August 2023 |
|
|
|
Belfast Labour Market Programme Gateway
to Choices Launch |
September 2023 |
|
|
|
Labour Market Programme Seminar |
September 2023 |
|
|
|
Go Succeed Launch |
November 2023 |
|
|
|
Building
an Inclusive Labour Market Conference (Ulster University) |
January
2024 |
|
Discussions
on: ·
Opportunities for greater engagement
between health and employment support services. ·
Potential implications of further
welfare reform. ·
Re-skilling and up-skilling support to
encourage labour market participation and progress. ·
A future investment model that can make
an impact. |
|
Business Breakfast |
January 2024 |
|
|
|
Sub regional planning workshop |
January 2024 |
|
|
|
Manufacturing Task Force Business
Breakfast |
February 2024 |
|
|
|
EPIC Futures NI - Local Policy
Innovation Partnership Launch |
March 2024 |
|
|
|
Go Succeed – Getting Social |
March 2024 |
|
|
|
Inclusive Employment and Social Value |
March 2024 |
|
|
|
CelebrateHer Conference |
March 2024 |
|
|
|
Waterford County Council and Southeast
Technology University, Waterford |
September 2023 January 2024 |
|
|
|
Digi Manufacturing 2.0 Industry
Matchmaking and Project Developments |
2023/24 |
|
|
|
UK Real Estate Investment and
Infrastructure Forum Event – Leeds - Belfast Region City Deal delegation |
May 2023 |
|
·
A
UK-only investment event for senior leaders from global investment funds and
property companies, public sector bodies, government, and the third sector.
·
An opportunity to
promote Mid and East Antrim, as a CleanTech hub of the region. |
·
Strong collaborative
investment opportunities through attendance at events of this scale, with
over 7,500 attendees. |
The Executive Office - Local Government
International Relations Working Group NI |
June 2023 October 2023 |
|
|
|
Improvement and Efficiency Social
Enterprise (iESE) Innovation Club |
June 2023 |
|
|
|
Hydrogen 2 Training Academy - Mid and
East Antrim Borough Council |
2023 - 2024 |
|
|
·
Significant
benchmarking has taken place with hydrogen training providers to develop
optimal training courses, with a unique offering from Levels 3-7.
|
Mid and East Antrim Net Zero (MEANZ)
Business project – funded by Innovate UK. |
July 2023 onwards |
|
·
Helps
local authorities address non-technical barriers to achieving net zero
targets. ·
The
Future Ready Programme for Net Zero Innovation and Delivery Officers provides
a Community of Practice (access to knowledge and information from other
projects and experts), an Academy programme (training, webinars, coaching,
information, access to expertise, and quarterly in-person knowledge transfer
and best practice visits), and an Insights series (best practice from
projects across the UK). ·
The
Council’s best practice was profiled and shared to Innovate UK’s extensive
network, via the Future Ready Newsletter. ·
Best
practice events and conferences showcasing net zero technologies and initiatives
(Hydrogen Ireland Conference and the All-Ireland Sustainability Summit). ·
Monthly
internal net zero initiative meetings. |
|
The Advanced Manufacturing and Energy
Innovation hub - UK Midlands, Mid and East Antrim Borough |
Autumn 2023 |
|
|
|
UK Hydrogen Economy Hub - Aberdeen City
Region, Scotland |
Autumn/Winter 2023 |
|
|
|
Building the Geothermal Sector Conference
- Queens University, multiple council participation. |
July 2023 |
|
|
|
Renewable Gas Conference - Phoenix
Energy, Department for the Economy, Department of Agriculture, Environment
and Rural Affairs, the Utility Regulator, and multiple council participation. |
October 2023 |
|
|
|
Energy Efficiency and Renewable
Projects |
March 2024 |
|
|
|
Changes
in Practice and Policies - All NI local authorities |
Ongoing |
|
|
|
Forest
Site Management for Health and Safety Workshop – Visitor Safety Group |
February
2024 |
|
·
Looked at industry
standards for the closure of forested or wooded sites when high winds are
predicted. ·
Each organisation
follows a similar rule, in that they close when a particular weather warning
is given. However, not all sites can be completely shut off to members
of the public due to their size and make up, for example, some forests have
multiple informal entrances. |
|
Open
water swimming Health and Safety Workshop – Visitor Safety Group |
February
2024 |
|
|
|
Woodland
creation visits - Belfast Hills Partnership |
April
2023 |
|
|
|
Visiting
ancient woodland restoration sites - Woodland Trust |
April
2023 |
|
|
|
Visiting
ancient woodland restoration sites - Woodland Trust, Cultra. |
April
2023 |
|
|
|
Agroforestry
and trees on farms site visits - Nature Friendly Farming Network |
April
2023 |
|
|
|
Site
Assessment Workshops - Woodland Trust |
June
2023 |
|
|
|
Mapping
workshop - Ordinance Survey NI |
August
2023 |
|
|
|
Belfast
Tree Strategy Launch - Belfast City Council |
October
2023 |
|
|
|
Working
practices and funding - Lisburn and Castlereagh City Council |
October
2023 |
|
|
|
Farm
visit Agroforestry Show 2023 – Growing Innovation Network NI (GrowIN) |
October
2023 |
|
|
|
Timber
from Wood products - College of Agriculture, Food and Rural Enterprise
(CAFRE) |
November
2023 |
|
|
|
Tree Survey Techniques - Belfast City
Council |
December 2023 |
|
|
|
Guess How Much I Love You Trail
-Lisburn and Castlereagh City Council |
August 2023 |
|
|
|
The Grange Play Park - Omagh |
June 2023 |
|
|
|
Garden Escapes Research Site Visits – Armagh
City, Banbridge and Craigavon Council area |
August 2023 |
|
|
|
Leave No Trace Awareness
Course - Causeway Coast and Glens Borough
Council |
April 2023 |
|
|
|
Urban Green Spaces in NI - Belfast City
Council and Queens University, Belfast |
June 2023 |
|
|
|
NI Forest School Association Conference |
September 2023 |
|
|
|
Playboard NI
and Mae Murray Foundation Launch |
March 2024 |
|
|
|
Templemore Baths Museum Team site visit |
August 2023 |
|
|
|
Tourist Attractions- Ards and North
Down Borough Council |
August 2023 |
|
|
|
Shared Island Scheme - Waterford City
and County Council |
September 2023 |
|
|
|
Site visit of The Courthouse, Bangor |
February 2024 |
|
|
|
Belfast’s Old Town: Overground,
Underground, what’s there to see? - Tour guide
experience, Belfast |
October 2023 |
|
|
|
Theatre programming - Antrim and
Newtownabbey Borough Council |
November 2023 |
|
|
|
Website development – Simpleview, other councils, Tourism NI Offices |
June 2023 |
|
|
|
September
2023 |
|
|
|
|
Dealing
with Invasive Species – Lough Neagh Partnership |
March
2024 |
|
|
·
Two
new methods were learnt on how to deal with Himalayan Balsam and Giant
Hogweed. |
Commemorative
Garden Site Visit - Antrim and Newtownabbey Borough Council Crematorium |
February
2024 |
|
|
·
Discussed
columbarium required for new Mid and East Antrim Borough Council cemeteries,
and commemorative garden design with the Crematorium Manager. |
For further information
contact us at:
Mid and East Antrim Borough
Council
1-29 Bridge Street
Ballymena
BT43 5EJ
Telephone number: 0300 1245
000
Email us at: enquiries@midandeastantrim.gov.uk
Visit our website: www.midandeastantrim.gov.uk
This is the end of the document.